Testing the synchronizing function

The voltage inputs used are:
UP3LN1
UP3BB1
Testing the frequency difference
The frequency difference test should verify that operation is achieved when the frequency
difference between bus and line is less than set value of
FreqDiffMin . The test procedure below will depend on the settings used. Input STARTSYN
must be activated during the test.
FreqDiffMax = 50.2 Hz
FreqDiffMin = 50.01 Hz
tBreaker = 0.080 s
1.
Apply voltages
1.1.
1.2.
2.
Check that a closing pulse is submitted at a closing angle equal to calculated phase angle
value from the formula below. Modern test sets will evaluate this automatically.
Closing Angle = |( (f
f
Bus
f
Line
tBreaker = Set closing time of the breaker
3.
Repeat with
Commissioning manual
U-Bus
U-Line
N
General test connection with three-phase voltage connected to the line side
UL1, UL2 or UL3 line 1 voltage inputs on the IED
Bus1 voltage input on the IED
UBaseLine and f-Line = 50.0 Hz
U-Line = 100%
UBaseBus and f-Bus = 50.15Hz
U-Bus = 100%
– f
Bus
Line
= Bus frequency
= Line frequency
IED
UMeasure
U3PBB1
Ph/N
Ph/Ph
N
Input Phase
L1,L2,L3
L12,L23,L31
UMeasure
Ph/N
U3PLN1
Ph/Ph
UL1
UL2
Input Phase
UL3
L1,L2,L3
N
L12,L23,L31
IEC05000480-4-en.vsd
FreqDiffMax and above set value of
) * tBreaker * 360 degrees) |
Testing functionality by secondary injection