1.3

Equipment Options

The following equipment lists provide an overview of the equipment normally required, highlighting differences for
the various scheme options. These lists should be used in conjunction with the diagrams that follow.
1.3.1

Solkor Plain/Overcurrent Protection Schemes

7PG2113/4/5/6 relay (5kV), 1 per feeder end
15kV isolation transformer, 1 per feeder end if required

1.3.2 Pilot Supervision 5kV Schemes

1.3.2.1
Send End
Pilot Supervision Send End relay (transformer+rectifier), 1 per circuit
B22 AC Supply Supervision relay, 1 per circuit
1.3.2.2
Receive End
Pilot Supervision Receive End relay (B74 & B75), 1 per circuit
Note: Although the 5kV scheme utilises a combined B75/B74 unit, the additional isolation requirements at 15kV
necessitate that separate units must be used.
1.3.3

15kV Schemes

1.3.3.1
Send End
15kV Pilot Supervision Send End relay (transformer+rectifier), 1 per circuit
B22 AC Supply Supervision relay, 1 per circuit. 5kV insulation as this is not connected to the pilots.
1.3.3.2
Receive End
15kV B75 relay, 1 per circuit
B74 relay, 1 per circuit
Note: Although the 5kV scheme utilises a combined B75/B74 unit, the additional isolation requirements at 15kV
necessitate that separate units must be used.
©2010 Siemens Protection Devices Limited
7PG2113/4/5/6 Solkor Applications Guide
Chapter 7 Page 5 of 49

Advertisement

Table of Contents
loading

This manual is also suitable for:

7pg21137pg21157pg2116

Table of Contents