Summary of Contents for UfiSpace S8901-54XC

  • Page 1 S8901-54XC Data Center ToR/Leaf Switch Hardware Installation Guide R1.1...
  • Page 2: Table Of Contents

    11 Initial System Setup ......................22 12 Cable Connections ......................23 Connecting the USB Cable ....................23 Connecting the OOB Management Cables ................23 Connecting the Transceivers ....................24 13 Cautions and Regulatory Compliance Statements .............. 25 S8901-54XC Hardware Installation Guide | i...
  • Page 3: Overview

    With a small form factor and high-density configurations, the S8901-54XC switch is a white box switch that can be positioned as a ToR (Top-of-Rack) or leaf switch to enable versatile connectivity and traffic management.
  • Page 4: Preparation

    PC with terminal emulation software. Refer to the "Initial System Setup" section for details. • Baud rate: 115200 bps • Data bits: 8 • Parity: None • Stop bits: 1 • Flow control: None S8901-54XC Hardware Installation Guide | 2...
  • Page 5: Installation Environment Requirements

    Space Clearance: The S8901-54XC width is 17.32 inches (44.0cm) and shipped with a rack mount brackets suitable for 19 inch (43.8cm) wide racks. The depth of the S8901-54XC chassis is 17.32 inches (44cm) without the field replaceable units (FRUs) and comes with adjustable mounting rails suitable for rack depths of 22 inches (55.9cm) to 33 inches (83.8cm).
  • Page 6: Preparation Check List

    • Cooling: The S8901-54XC has two options for airflow direction. There is a back-to-front option (Figure 3. Left) and a front-to-back option (Figure 3. Right). Make sure the equipment on the same rack have the same airflow direction. Back-to-Front Airflow Front-to-Back Airflow Figure 3.
  • Page 7: Package Contents

    Mounting Rail) Power Cord 1.43lb (650g)/2pcs 72.05” (1830mm) 2 pcs (AC Version only) 0.72lb (325g)/pcs USB 3.0 cable 7.87” (200mm) 1 pcs 0.038lb (17.2g)/pcs RJ45 to DB9 Female 95.98” (2438mm) 1 pcs 0.23lb (105g)/pcs Cable S8901-54XC Hardware Installation Guide | 5...
  • Page 8: Component Physical Information

    AC power cord (AC version only) 0.72lbs (325g) RJ45 to DB9 female cable 0.23lbs (105g) S8901-54XC (W x D x H) 17.32” x 17.32” x 1.72” (440 x 440 x 43.8mm) Dimension PSU (W x D x H) 1.99” x 8.30” x 1.57” (50.5 x 211 x 40mm) Fan module (W x D x H) 2.03”...
  • Page 9: Identifying Your System

    4 Identifying Your System S8901-54XC System Overview Figure 5. S8901-54XC Hardware Installation Guide | 7...
  • Page 10: Dc Version Psu Overview

    The DC power supply units are the same size for both back-to-front airflow and front-to-back airflow. Therefore, only the dimensions for back-to-front airflow PSU will be provided in the figure below. (Back-to-Front Airflow PSU) Figure 7. S8901-54XC Hardware Installation Guide | 8...
  • Page 11: Ac Version Psu Overview

    The AC power supply units are the same size for both back-to-front airflow and front-to-back airflow. Therefore, only the dimensions for back-to-front airflow PSU will be provided in the figure below. (Back-to-Front Airflow PSU) Figure 9. S8901-54XC Hardware Installation Guide | 9...
  • Page 12: Fan Overview

    The picture on the bottom is for the fans with front-to-back airflow, identified with a red handle. (Back-to-Front Airflow Fans) (Front-to-Back Airflow Fans) Figure 10. Port Overview Port ID Form Factor Maximum Support Distance Support Speed 0 ~ 47 SFP28 80km (49.7mi) 1/10/25G 48~53 QSFP28 80km (49.7mi) 40/100G Figure 11. S8901-54XC Hardware Installation Guide | 10...
  • Page 13: Rack Mounting

    8 M4.0*L6.5mm screws provided with the package. Figure 12. There are multiple locations where rack mount brackets may be secured to the switch. The figure below shows the various locations for securing the rack mount brackets. Figure 13. S8901-54XC Hardware Installation Guide | 11...
  • Page 14 For a 4 post rack, first secure the adjustable mounting rail to the back of the switch using the M4.0*L6.5mm screws provided in the package. Then secure the adjustable mounting rail to the rack posts. (See Figure Below). Figure 15. S8901-54XC Hardware Installation Guide | 12...
  • Page 15: Installing Fan Modules

    4. Carefully slide the new fan module into the fan bay and gently push until it is flush with the case. 5. Secure the captive screw on the fan module to lock the fan in place. Figure 18. S8901-54XC Hardware Installation Guide | 13...
  • Page 16: Installing Power Supply Units

    2. While holding down the release tab, grip the PSU's handle and firmly pull it out of the power bay. DC Version: AC Version: Figure 20. 3. Align the new PSU with the power bay, ensuring the PSU’s power connector is in the correct position. S8901-54XC Hardware Installation Guide | 14...
  • Page 17 5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is in the wrong direction. Illustrations are for reference purposes only. Actual PSU position may differ. DC Version: AC Version: Figure 21. S8901-54XC Hardware Installation Guide | 15...
  • Page 18: Grounding The Switch

    3. Insert the exposed grounding wire all the way into the hole of the grounding lug (provided with package contents). 4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 22. S8901-54XC Hardware Installation Guide | 16...
  • Page 19 Figure 23. 6. Using 2 M4 screws and 2 washers (provided with the package contents), firmly lock the grounding lug to either of the designated grounding locations on the switch. Figure 24. S8901-54XC Hardware Installation Guide | 17...
  • Page 20: Connecting Power

    Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S8901-54XC is designed to support 1 + 1 power redundancy. 2. Attach the power cable.
  • Page 21: Ac Version

    Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S8901-54XC is designed to support 1 + 1 power redundancy.
  • Page 22: Verifying System Operation

    PSU0 working normal Blinking Amber PSU0 fail (PSU0 needs service) No power Solid Green PSU1 working normal Blinking Amber PSU1 fail (PSU1 needs service) No Power Blinking Blue Beacon feature is enabled on the switch S8901-54XC Hardware Installation Guide | 20...
  • Page 23: Psu Fru Led

    Fan is abnormal, service is required Management Port LED LED Condition Equipment Status Left LED No power Solid Green 1G link-up Blinking Green 1G TX/RX activity Right LED No power Solid Amber 10M/100M link-up Blinking Amber 10M/100M TX/RX activity S8901-54XC Hardware Installation Guide | 21...
  • Page 24: Initial System Setup

    After the connection is established, a prompt for the username and password displays. Enter the username and password to access the CLI. The username and password should be provided by the Network Operating System (NOS) vendor. S8901-54XC Hardware Installation Guide | 22...
  • Page 25: Cable Connections

    Connect the USB 3.0 A Type plug (male connector) into the USB port (female connector) located on the front panel of the switch. Figure 30. Connecting the OOB Management Cables Connect the OOB management cable by locating the RJ45 OOB port marked a symbol. Figure 31. S8901-54XC Hardware Installation Guide | 23...
  • Page 26: Connecting The Transceivers

    3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and use gentle pressure to secure it in place. An audible click can be heard when the transceiver is secured in the port. S8901-54XC Hardware Installation Guide | 24...
  • Page 27: Cautions And Regulatory Compliance Statements

    The equipment and its modules should only be repaired, maintained or replaced by skilled personnel. Instructed person is a term applied to persons who have been instructed and trained by a skilled person, or who is supervised by a skilled person. S8901-54XC Hardware Installation Guide | 25...
  • Page 28 www.ufispace.com...