UfiSpace S9301-32DB Hardware Installation Manual

200ge/400ge spine & leaf switch

Advertisement

Quick Links

S9301-32DB
200GE/400GE
Spine & Leaf Switch
Hardware Installation Guide
R1.0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S9301-32DB and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for UfiSpace S9301-32DB

  • Page 1 S9301-32DB 200GE/400GE Spine & Leaf Switch Hardware Installation Guide R1.0...
  • Page 2: Table Of Contents

    Package Contents ........................ 5 Accessory List ........................... 5 Component Physical Information .................... 6 Identifying Your System ....................... 7 S9301-32DB DC Version Overview ..................7 S9301-32DB AC Version Overview ................... 9 DC Version PSU Overview ...................... 10 AC Version PSU Overview ...................... 11 Fan Overview .........................
  • Page 3 Connecting the Transceivers ....................30 13 Cautions ..........................31 S9301-32DB Hardware Installation Guide | ii...
  • Page 4: Overview

    1RU form factor that helps reduce infrastructure and administrative costs. The S9301-32DB is the epitome of future networking with a powerful Intel Skylake 8-core processor and Broadcom Trident4 X9 switching ASIC. It comes with redundant, hot swappable components for convenience, increased availability, reliability and lower costs of maintenance.
  • Page 5: Preparation

    PC with terminal emulation software. Refer to the "Initial System Setup" section for details. • Baud rate: 115200 bps • Data bits: 8 • Parity: None • Stop bits: 1 • Flow control: None S9301-32DB Hardware Installation Guide | 2...
  • Page 6: Installation Environment Requirements

    1.5 inches (3.8cm). Therefore, to accommodate the fan handles, power supply handles and cable routing, a minimum space clearance of 6 inches (15.24cm) is needed at the front and back of the S9301-32DB. A total minimum reserve depth of 37.4 inches (95cm) is required.
  • Page 7: Preparation Check List

    • Cooling: The S9301-32DB has two options for airflow direction. There is a back-to-front option (Figure 3. Left) and a front-to-back option (Figure 3. Right). Make sure the equipment on the same rack have the same airflow direction. (Back-to-Front Airflow) (Front-to-Back Airflow) Figure 3.
  • Page 8: Package Contents

    (661.3 x 43.8 x 22.4mm) Screw Kit 2 x Screws M4.0*L5.5mm 1 set 0.004lbs (1.9g)/set (for Adjustable Mounting Rail) RJ45 to DB9 Female 8” (2.4m) 1pcs 0.27lbs(123.9g)/pcs Cable USB 3.0 Cable 7.8” (20cm) 1pcs 0.03lbs(16g)/pcs S9301-32DB Hardware Installation Guide | 5...
  • Page 9: Component Physical Information

    AC power cord (AC version only) 0.7lbs (318g) RJ45 to DB9 female cable 0.27lbs (123.9g) S9301-32DB (W x D x H) 17.17” x 25.4” x 1.72” (436 x 645 x 43.8mm) Dimension PSU (W x D x H) 1.99” x 12.64” x 1.57” (50.5 x 321 x 40mm) Fan module (W x D x H) 1.98”...
  • Page 10: Identifying Your System

    4 Identifying Your System S9301-32DB DC Version Overview Figure 5. S9301-32DB Hardware Installation Guide | 7...
  • Page 11 Figure 6. S9301-32DB Hardware Installation Guide | 8...
  • Page 12: S9301-32Db Ac Version Overview

    S9301-32DB AC Version Overview Figure 7. S9301-32DB Hardware Installation Guide | 9...
  • Page 13: Dc Version Psu Overview

    The picture below on the left is the intake type DC PSU, which is for back-to-front airflow and has a blue latch. The picture below on the right is the exhaust type DC PSU for front-to-back airflow and has a red latch. (Back-to-Front Airflow PSU) (Front-to-Back Airflow PSU) Figure 9. S9301-32DB Hardware Installation Guide | 10...
  • Page 14: Ac Version Psu Overview

    AC PSU, which is for back-to-front airflow and has a blue latch. The picture on the right shows the exhaust type AC PSU for front-to-back airflow and has a red latch. (Back-to-Front Airflow PSU) (Front-to-Back Airflow PSU) Figure 11. S9301-32DB Hardware Installation Guide | 11...
  • Page 15: Fan Overview

    There are two types of fans represented in Figure 13. The top picture shows fans with back-to- front airflow and has a blue handle. The picture on the bottom shows fans with front-to-back airflow and has a red handle. (Back-to-Front Airflow Fans) (Front-to-Back Airflow Fans) Figure 13. S9301-32DB Hardware Installation Guide | 12...
  • Page 16: Port Overview

    Port Overview Port ID Form Factor Supported Distance Support Speed 0 ~ 23 QSFP56 SR4, LR4, ER4, ZR4 200GE/100GE 24 ~ 31 QSFP-DD SR8, LR8, ER8, ZR8 400GE/200GE/100GE Figure 14. S9301-32DB Hardware Installation Guide | 13...
  • Page 17: Rack Mounting

    Make sure the captive screw of the inner rail is positioned at the front of the chassis. 2.2 After the attachment pins are secured to the inner rail, lock the inner rail to the chassis using two M4 screws (one on each chassis side). See Figure 16. S9301-32DB Hardware Installation Guide | 14...
  • Page 18 3.2 Once the rear bracket is secured, pull back the clip of the front bracket attach it to the rack. An audible click can be heard when the bracket is secured onto the rack. Figure 18. S9301-32DB Hardware Installation Guide | 15...
  • Page 19 4.4 Push the blue release tab on each rail to unlock the rails and slide the chassis all the way into the rack. 4.5 Lock the chassis into place by using the captive screw on the front of the inner rail. Figure 19. S9301-32DB Hardware Installation Guide | 16...
  • Page 20: Installing Fan Modules

    4. Carefully slide the new fan module into the fan bay and gently push until it is flush with the case. 5. Secure the captive screw on the fan module to lock the fan in place. Figure 22. S9301-32DB Hardware Installation Guide | 17...
  • Page 21: Installing Power Supply Units

    1. Locate the release tab on the PSU. Then press and hold down the release tab to unlock the PSU from the power bay. 2. While holding down the release tab, grip the PSU's handle and firmly pull it out of the power bay. Figure 24. S9301-32DB Hardware Installation Guide | 18...
  • Page 22 5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the way if it is in the wrong direction. Illustrations are for reference purposes only. Actual PSU position may differ. DC Version Figure 25. AC Version Figure 26. S9301-32DB Hardware Installation Guide | 19...
  • Page 23: Grounding The Switch

    3. Insert the exposed grounding wire all the way into the hole of the grounding lug (provided with package contents). 4. Using a crimping tool, firmly secure the grounding wire to the grounding lug. Figure 27. S9301-32DB Hardware Installation Guide | 20...
  • Page 24 Figure 28. 6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the grounding lug to either of the designated grounding locations on the router. Figure 29. S9301-32DB Hardware Installation Guide | 21...
  • Page 25: Connecting Power

    Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9301-32DB is designed to support 1 + 1 power redundancy. 2. Attach the DC power cables to the lugs.
  • Page 26 Use a heat source to secure the heat shrink tubing in place. Allow the heat shrink tubing to cool before attaching the DC power cable. An example of the installed DC version with insulation material as below. Figure 32. S9301-32DB Hardware Installation Guide | 23...
  • Page 27 6. Verify that the power supply is operating. If connected correctly, when turned on, the LED on the PSU will light up with a Green color designating normal operation. S9301-32DB Hardware Installation Guide | 24...
  • Page 28: Ac Version

    Also, please ensure that both PSUs have been properly installed before powering up the equipment, as the S9301-32DB is designed to support 1 + 1 power redundancy. 2. Attach the power cable.
  • Page 29: Verifying System Operation

    PSU0 working normal Blinking Amber PSU0 fail (PSU0 needs service) PSU1 No power Solid Green PSU1 working normal Blinking Amber PSU1 fail (PSU1 needs service) No Power Blinking Blue Beacon feature is enabled on the switch S9301-32DB Hardware Installation Guide | 26...
  • Page 30: Psu Fru Led

    Blinking Green (2/sec) Power supply firmware updating (Boot-loader mode). Fan FRU LED LED Condition Equipment Status No input power Solid Green Fan is functioning normal Solid Amber Fan is abnormal, service is required S9301-32DB Hardware Installation Guide | 27...
  • Page 31: Initial System Setup

    After the connection is established, a prompt for the username and password displays. Enter the username and password to access the CLI. The username and password should be provided by the Network Operating System (NOS) vendor. S9301-32DB Hardware Installation Guide | 28...
  • Page 32: Cable Connections

    There are two types of OOB management ports that can both access the x86 for management purposes. 1. The first port type is the RJ45 OOB port marked a symbol. 2. The second port type is the two 10G SFP+ ports also marked with a symbol. Figure 38. S9301-32DB Hardware Installation Guide | 29...
  • Page 33 3. Place the bail (wire handle) in the unlocked position and align the transceiver with the port. 4. Slide the transceiver into the port and use gentle pressure to secure it in place. An audible click can be heard when the transceiver is secured in the port. S9301-32DB Hardware Installation Guide | 30...
  • Page 34 The equipment and its modules should only be repaired, maintained or replaced by skilled personnel. Instructed person is a term applied to persons who have been instructed and trained by a skilled person, or who is supervised by a skilled person. S9301-32DB Hardware Installation Guide | 31...
  • Page 35 www.ufispace.com...

Table of Contents