Carrier 59SC6A Installation Instructions Manual page 66

Single-stage, high efficiency, 4-way multipoise 35-in. (889 mm), condensing gas furnace
Table of Contents

Advertisement

59SC6A: Installation, Start-up, Operating and Service and Maintenance Instructions
3. Align the edges of the one-piece burner with the slots in the burner
assembly and slide the burners forward until they are fully seated in
the burner assembly.
4. Align the orifices in the manifold assembly with the support rings
on the end of the burner.
5. Insert the orifices in the support rings of the burners.
NOTE: If manifold does not fit flush against the burner, do not force the
manifold on the burner assembly. The burners are not fully seated
forward in the burner assembly. Remove the manifold and check burner
positioning in the burner assembly before re-installing the manifold.
6. Attach the green/yellow wire and ground terminal to one of the
manifold mounting screws.
7. Install the remaining manifold mounting screws.
8. Check the igniter alignment. See
9. Attach the wires to the roll-out switches.
10. Align the burner assembly with the openings in the primary cell
inlet panel and attach the burner assembly to the cell panel.
11. Connect the wire for the flame sensor.
12. Connect the wire for the Hot Surface Igniter.
NOTE: Use propane-resistant pipe dope to prevent leaks. Do not use
PTFE thread-seal tape.
13. Install the gas pipe to the gas valve.
WARNING
!
FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury, death,
and/or property damage.
Never purge a gas line into a combustion chamber. Never test for gas
leaks with an open flame. Use a commercially available soap solution
made specifically for the detection of leaks to check all connections. A
fire or explosion may result causing property damage, personal injury
or loss of life.
14. Check for gas leaks with a commercially available soap solution
made specifically for the detection of leaks.
15. Turn gas on at electric switch on gas valve and at external shut-off
or meter
16. Turn power on at external disconnect, fuse or circuit breaker.
17. Run the furnace through two complete heating cycles to check for
proper operation
18. Install control door when complete.
1-1/4-in.
(31.8)
2-1/2-in.
(64.4)
Fig. 69 – Igniter Position - Top View
Fig. 70 – Igniter Position - Side View
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Fig.
68,
Fig.
69, and
Fig.
70.
A11405
L12F041
Servicing Hot Surface Igniter
The igniter does NOT require annual inspection. Check igniter
resistance before removal. Refer to
1. Turn off gas and electrical supplies to furnace.
2. Remove control door.
3. Disconnect igniter wire connection.
4. Check igniter resistance. Igniter resistance is affected by
temperature. Only check resistance when the igniter is at room
temperature.
a. Using an ohm meter, check resistance across both igniter leads in
connector.
b. Cold reading should be between 40 ohms and 70 ohms.
5. Remove igniter assembly.
a. Using a 1/4-in. driver, remove the two screws securing the igniter
mounting bracket to the burner assembly See
b. Carefully withdraw the igniter and bracket assembly through the
front of the burner assembly without striking the igniter on
surrounding parts.
c. Inspect igniter for signs of damage or failure.
d. If replacement is required, remove the screw that secures the
igniter on igniter bracket and remove the igniter.
6. To replace igniter and bracket assembly, reverse items 5a through
5d.
7. Reconnect igniter harness to the igniter, dressing the igniter wires to
ensure there is no tension on the igniter itself. See
8. Turn on gas and electrical supplies to furnace.
9. Verify igniter operation by initiating control board self-test feature
or by cycling thermostat.
10. Replace control door.
Flushing Collector Box and Drainage System
!
ELECTRICAL SHOCK AND FIRE HAZARD
Failure to follow this warning could result in personal injury, death,
and/or property damage.
Turn off the gas and electrical supplies to the furnace and install lockout
tag before performing any maintenance or service. Follow the operating
instructions on the label attached to the furnace.
1. Turn off gas and electrical supplies to furnace.
2. Remove control door.
3. Disconnect pressure switch tube from pressure switch port.
NOTE: Ensure the pressure switch tube disconnected from the pressure
switch is higher than the collector box opening or water will flow out of
tube.
4. Remove the collector box plug from the top port on the upper
corner of the collector box. See
5. Attach a funnel with a flexible tube to port on the collector box.
6. Flush inside of collector box with water until discharge water from
condensate trap is clean and runs freely.
7. Repeat steps 4 through 6 with middle plug on upper corner of
collector box.
8. Remove the pressure switch tube from the collector box.
NOTE: Do NOT blow into tube with tube connected to the pressure
switch.
9. Clean pressure switch port on collect box with a small wire. Shake
any water out of pressure switch tube.
10. Reconnect tube to pressure switch and pressure switch port.
66
Fig.
68,
Fig.
69, and
Fig.
Fig.
68.
Fig.
WARNING
Fig.
62.
70.
68.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents