Step 3: Turn on the PV switch.
Note: For Australia and New Zealand the PV SWITCH is not integrated.
Note: The external isolation devices for PV array ports shall include the requirement of an
additional external break switching device that conforms to the requirements AS/NZS 4777.1
Step 4: Turn on the grid breaker.
Step 5: If backup load is applied, switch on the backup breaker.
Step 6: Close the battery breaker cover.
Step 7: Configure the WIFI stick (Only if this is the first time turning on the system).
Please follow the instructions in section 4 to section 5.