Download Print this page

CALEFFI SATK15313 ABC Installation, Operation And Maintenance Manual

Wall-mounted heat interface unit - hiu, instantaneous domestic hot water production - mechanical control

Advertisement

Quick Links

Wall-mounted Heat Interface Unit - HIU
Instantaneous domestic hot water production - Mechanical control
©
opyright 2013
aleffi
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Technical specifications
Materials
Frame:
Exchanger:
Connection pipes:
Components:
Performances
Medium:
Maximum medium temperature:
Max. pressure:
- primary circuit:
- domestic hot water circuit: PN 10 bar
DHW exchanger capacity:
Domestic hot water flow rate:
HIU connections:
Primary circuit:
Heating circuit:
DHW circuit:
Box contents:
- HIU
- instructions
- fixing screws
- DPCV 30 kPa
Weight
code SATK15313 ABC:
Characteristic components
ç
é è
steel plate
brazed
copper
brass EN12165 CW617N
water, max. 30% glycol
PN 10 bar
40 kW
min. 1,8 ± 0,3 l/min
max. 18 l/min
3/4" M
3/4" M
3/4" M
ê
Function
The SATK Heat Interface Unit (HIU) independently controls the
heating and domestic hot water generation in an individual
apartment within a centralised boiler or district heating system.
Product Range
SATK15313 ABC
Dimensions
85°C
E
E
F
B
A
8 Kg
570
110
G
70
157,5
1 - DHW Differential pressure priority valve
2 - Manual air vent
3 - 40 kW Brazed exchanger
4 - Mechanical modulating valve with
manual pre-set
5 - DPCV (differential pressure
control valve)
6 - Heat meter template spacer
1
www.c leffi.com
SATK15313 ABC
HIGH
temperature
wall-mounted
instantaneous production of DHW, mechanical
regulation with 30 kPa DPCV.
E
E
E
G
H
G
B
B
A
B
C
D
243
195
H
L
157
Primary circuit flow
Primary circuit return
Domestic hot water outlet
Domestic cold water inlet
Flow heating circuit
Return heating circuit
78231EN
HIU
L
D C
F
B
E
F
3/4"
105

Advertisement

loading

Summary of Contents for CALEFFI SATK15313 ABC

  • Page 1 DHW circuit: 3/4” M Box contents: - HIU - instructions - fixing screws - DPCV 30 kPa Weight code SATK15313 ABC: 8 Kg 3/4” 157,5 Characteristic components ê ç 1 - DHW Differential pressure priority valve 2 - Manual air vent...
  • Page 2 Installation Initial operation The SATK series is designed for installation in a sheltered domestic Filling the central heating system environment (or similar), therefore cannot be installed or used Open the shut-off valves on the connections to the centralized line outdoors, i.e. in areas directly exposed to atmospheric agents. and, in the central heating system, proceed with charging the Outdoor installation may cause malfunctioning and hazards.