Page 1
A-207 Re-Assembly Instruction Supplement 1 Preparation These instructions are specific to the reassembly of the A-207 Vacuum Relief Valves. For more maintenance and installation instructions, please refer to Midland’s Installation, Operation and Maintenance Instructions for A-205/A-222 Vacuum Relief Valves. • Exercise normal safety precautions for the commodity involved.
Page 2
Run a steel rule under the lower side of the quad-ring to make sure the back side of the quad-ring is well seated. Figure 5 A-207 Re-Assembly Instruction Supplement, Ver. 0.0 Issue Date: April 27, 2020 Page 2 of 4...
Page 3
(item 7) on top of valve as shown. Insert retainer ring (item 8) in groove as shown. Figures 10-11 A-207 Re-Assembly Instruction Supplement, Ver. 0.0 Issue Date: April 27, 2020 Page 3 of 4...