Download Print this page

Sharp SKM427F9HS Installation Instructions Manual page 6

Carousel built-in kit

Advertisement

FLUSH INSTALLATION INSTRUCTIONS
4. BACK FRAME INSTALLATION: Position BACK FRAME
equal space top to bottom, side to side. Mark for 4 holes
on the installed wood cleats, center punch and pre-drill
" drill bit. Secure frame with 4 SCREWS E. See
1
with
16
Figure 7.
Mounting holes
Screw E
Equal gap
side to side
Equal gap top, bottom
Screw E
Mounting holes
5. Install Air Deflectors top and bottom. Center (left and right)
the Air Deflectors above and below the installed BACK
FRAME. Secure AIR DEFLECTORS with 4 SCREWS E.
See Figure 8. Mark holes and pre-drill the wood cleats
" drill bit.
1
with
16
Mounting holes
Screw E
Screw E
Mounting holes
Figure 7
Figure 8
6. FRONT FRAME INSTALLATION: Place the FRONT
FRAME onto the BACK FRAME and align ball studs
and receivers. Secure the FRONT FRAME to the BACK
FRAME by firmly pushing the FRONT FRAME onto the
BACK FRAME engaging the 4 snap attachments. See
Figures 9 and 10.
6
Snap
attachment
Figure 9
Figure 10

Advertisement

loading

This manual is also suitable for:

Skm430f9hs