CanadianSolar CSI-125K-T600GL02-E Installation And Operation Manual

CanadianSolar CSI-125K-T600GL02-E Installation And Operation Manual

Csi grid-tied pv inverter 125kw

Advertisement

Quick Links

Global Headquarters
CSI Solar Co., Ltd.
199 Lushan Road, SND, Suzhou, Jiangsu, China, 215129
P +1 519 837 1881
F +1 519 837 2550
Sales Inquiries Email: info@csisolar.com
Customer Support Email: service.ca@csisolar.com
Europe, Middle East & Africa
Canadian Solar EMEA GmbH
LandsbergerStraße 94, 80339 Munich, Germany
P +49 (0) 89 519 968 90
F +49 (0) 89 519 968 911
Sales Inquiries Email: sales.emea@csisolar.com
Customer Support Email: service.emea@csisolar.com
Australia
Canadian Solar MSS (Australia) Pty Ltd
44 Stephenson St, Cremorne VIC 3121, Australia
P +61 ( 3 ) 860 918 44
Sales Inquiries Email: sales.au@csisolar.com
Customer Support Email: service.au@csisolar.com
South East Asia
101 Thompson Road #15-03 United Square, Singapore 307591
P +65 6572 905
F +65 6559 4690
Sales Inquires Email: sales.sg@csisolar.com
Customer Support Email: service.cn@csisolar.com
Latin America
Canadian Solar Brazil
Avenida Roque Petroni Junior, 999, 4º andar Vila Gertrudes,
São Paulo, Brasil,CEP 04707-910
P +55 11 3957 0336
Sales Inquiries Email:sales.br@csisolar.com
Customer Support Email: service.latam@csisolar.com
This manual is subject to change without prior notification. Copyright is reserved.
Duplication of any part of this issue is prohibited without written permission.
Please adhere to the actual products in case of any discrepancies in this user manual.
CSI GRID-TIED PV INVERTER 125KW
INSTALLATION AND OPERATION MANUAL
VERSION 1.0
Version 1.0, Release Date: 05,2021
CSI Solar Co., Ltd.
199 Lushan Road, SND, Suzhou, Jiangsu, China, 215129
www.csisolar.com
(2020.9)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CSI-125K-T600GL02-E and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for CanadianSolar CSI-125K-T600GL02-E

  • Page 1 Global Headquarters CSI Solar Co., Ltd. CSI GRID-TIED PV INVERTER 125KW 199 Lushan Road, SND, Suzhou, Jiangsu, China, 215129 P +1 519 837 1881 INSTALLATION AND OPERATION MANUAL F +1 519 837 2550 VERSION 1.0 Sales Inquiries Email: info@csisolar.com (2020.9) Customer Support Email: service.ca@csisolar.com Europe, Middle East &...
  • Page 2: Table Of Contents

    Contents Contents 1. Introduction 6.5 Settings ………………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………… 1.1 Product Description 6.5.1 Set Time ……………………………………………………………………………………………………… …………………………………………………………………………………………………… 1.2 Unpacking and storage ……………………………………………………………………………………………… 6.5.2 Set Address …………………………………………………………………………………………………… 1.2.1 Storage 6.6 Advanced Info - Technicians Only ……………………………………………………………………………………………………………… …………………………………………………………………………… 2. Safety instructions 6.6.1 Alarm Message ………………………………………………………………………………………………………………………...
  • Page 3: Introduction

    1. Introduction 1. Introduction 1.1 Product Description 1.2 Unpacking and storage Canadian Solar Three phase Inverters covert DC power from the photovoltaic(PV) array The inverter ships with all accessories in one carton. into alternating current(AC) power that can satisfy local loads as well as feed the power When unpacking, please verify all the parts listed below are included: distribution grid.
  • Page 4: Storage

    1. Introduction 2. Safety Instructions 1.2.1 Storage Improper use may result in electric shock hazards or burns. This product manual contains important instructions that are required to be followed during installation and maintenance. If the inverter is not installed immediately, storage instructions and environmental conditions are below: Please read these instructions carefully before use and keep them in an easily locatable place ●...
  • Page 5: Notice For Use

    2. Safety Instructions 3. Installation 3.1 Environmental considerations 3.1.1 Select a location for the inverter CAUTION When selecting a location for the inverter, consider the following: Risk of electric shock from energy stored in the inverter's capacitors. Do not remove cover until five (5) minutes after disconnecting all sources WARNING: Risk of fire of supply have passed, and this can only be done by a service technician.
  • Page 6: Other Environmental Considerations

    3. Installation 3. Installation 3.1.1.1 Examples of correct and incorrect installations 3.1.2.3 Avoiding direct sunlight Installation of the inverter in a location exposed to direct sunlight should to be avoided. Direct exposure to sunlight could cause: ● Power output limitation (with a resulting decreased energy production by the system). ●...
  • Page 7: Mounting The Inverter

    3. Installation 3. Installation 3.3.1 Wall mounting Refer to figure 3.6 and figure 3.7 Inverter shall be mounted vertically. The steps to mount the inverter are listed below. 1. Refer to Figure 3.6, drill holes for mounting screws based on the hole diameter of bracket using a precision drill keeping the drill perpendicular to the wall.
  • Page 8: Rack Mounting

    3. Installation 3. Installation 3.3.2 Rack mounting The steps to mounted to the rack are listed below: 3. Install mounting plate 1. Select a location for the inverter 1) Remove the bracket and fasteners from the packaging. Mark the position for hole, drilling according to the hole positions of the bracket.
  • Page 9: Electrical Connections

    3. Installation 3. Installation 3.4 Electrical Connections 3) Align the mounting plate with the holes, Insert the combination bolt (M10X40)through the The inverter is designed with a wiring box at the bottom. Before the electrical connection, it mounting plate into the hole. Secure the bracket to the metal frame firmly with the supplied requires the cover for the bottom wiring box to be removed.
  • Page 10: Grounding

    3. Installation 3. Installation 3.4.1 Grounding 4) Insert the stripped wire into the OT terminal crimping area and use the hydraulic To effectively protect the inverter, two grounding methods must be performed. Connect the AC grounding cable (Please refer to section 3.4.3) clamp to crimp the terminal to the wire (see Figure 3.16).
  • Page 11: Connect Pv Side Of Inverter

    3. Installation 3. Installation 3.4.2 Connect PV side of inverter 4. Insert the cable through the nut, sheath, and DC terminal cover. Connect the cable to the DC terminal block in turn, using a socket wrench.Tighten the screws on the terminal block. WARNING The torque is 10~20Nm.
  • Page 12: Connect Grid Side Of Inverter

    3. Installation 3. Installation 3.4.3 Connect grid side of inverter Requirements for the PV modules per MPPT input: WARNING ● All PV modules must be of the same type and power rating. An over-current protection device must be used between the inverter and ●...
  • Page 13 3. Installation 3. Installation 3.4.3.2 Wiring procedure CAUTION Copper terminal of cable RISK OF ELECTRIC SHOCK. Prior to starting the wiring procedure, ensure flat gasket that the three-pole circuit breaker is switched off and cannot be reconnected. spring washer NOTE Damage or destruction of the inverter's electronic components due to moisture and dust intrusion will occur if the enclosure opening is enlarged.
  • Page 14: Rs485 Communication

    4. Comm. & Monitoring 4. Comm. & Monitoring 4.1 RS485 communication There are 5 communication terminals on Canadian Solar 125kW inverter. COM1 is a RS-485 communication supports two connections methods: RJ45 connectors/ Terminal 4-pin connector reserved for WiFi/Cellular datalogger. COM2 and COM3 are RS485 board.(Default Modbus RTU) connection between inverters and both RJ45 and Terminal block are provided for use .
  • Page 15: Ethernet Communication

    4. Comm. & Monitoring 4. Comm. & Monitoring 4.2 Ethernet communication 2. RS-485 communication through terminal board. Use the RJ45 connectors to perform the Ethernet communication which supports the The cross sectional area of the cable wire for terminal board connection should be 0.2-1.5mm. Canadian Solar Monitoring Platform and Modbus TCP protocol(Both By Default).
  • Page 16 4. Comm. & Monitoring 4. Comm. & Monitoring 1.Monitoring Platform After the daisy chain connection is finished, please use the SN/QR code on the board to NOTE: Laptop IP Configuration register the system on Canadian Solar monitoring website or APP. Step 1: With a network cable to connect the computer and LAN Stick, right-click the computer icon in the lower right corner of the computer, enter the “network and sharing center”.
  • Page 17: Commissioning

    5. Commissioning 5. Commissioning 5.1 Selecting the appropriate grid standard 5.1.1 Verifying grid standard for country of installation 3). Use the UP/DOWN keys to highlight the SELECT STANDARD option. Press enter to select. Canadian Solar inverters are used worldwide and feature preset standards for operating on any grid.
  • Page 18: Preliminary Checks

    5. Commissioning 5. Commissioning 5.4 Preliminary checks 3). Measure the voltage present between the positive and negative wires of each string. WARNING If the open circuit voltage of the string is near the maximum value accepted by the High Voltage. inverter, verify the string length.
  • Page 19: Ac Configuration

    5. Commissioning 6. Normal operation 6.1 Start-up procedure 5.4.4 AC configuration To start-up the inverter, it is mandatory that the steps below are followed in the exact order outlined. Verify AC configuration. 1). Ensure the commissioning checks in Section 5 have been performed. 5.4.4.1 Measure VAC and frequency 2).
  • Page 20: Main Menu

    6. Normal operation 6. Normal operation Display Duration Description In normal operation, LCD screen alternatively shows inverter power and operation status (see Figure 6.1). The screen can be scrolled manually by pressing the UP/DOWN keys. VPV_Total: Shows input voltage total. VPV_Total: 1000.0V 10 sec IPV_Total:...
  • Page 21: Lock Screen

    6. Normal operation 6. Normal operation 6.4.1 Lock Screen 6.6 Advanced Info - Technicians Only Pressing the ESC key returns to the Main Menu. Pressing the ENTER key locks NOTE: (Figure 6.2(a)) or unlocks (Figure 6.2 (b)) the screen. To access to this area is for fully qualified and accredited technicians only. Enter menu “Advanced Info.”...
  • Page 22: Version

    6. Normal operation 6. Normal operation 6.6.3 Version 6.6.6 Yearly Energy The screen shows the model version of the inverter. And the screen will show the The function is for checking the energy generation for selected year. software ver by pressing the UP and DOWN at the same time.(see Figure 6.7). YES=<ENT>...
  • Page 23: Advanced Settings - Technicians Only

    6. Normal operation 6. Normal operation 6.7 Advanced Settings - Technicians Only NOTE: OV-G-V1: 300---480V OV-G-F1: 50.2-63Hz To access to this area is for fully qualified and accredited technicians only. OV-G-V1-T: 0.01---9S OV-G-F1-T: 0.01---9S Please follow 6.4 to enter password to access this menu. OV-G-V2: 300---490V OV-G-F2: 51-63Hz OV-G-V2-T: 0.01---1S...
  • Page 24: Reset Password

    6. Normal operation 6. Normal operation 6.7.4 Reset Password 6.7.7 Special Settings This function is used to set the new password for menu “Advanced info.” and “Advanced information” (see Figure 6.19). This function is applicable by maintenance personnel only, wrong operation will prevent the inverter from reaching maximum power.
  • Page 25: Hmi Update

    6. Normal operation 6. Normal operation 6.7.10 HMI Update 6.7.12 Debug Parameter This section is applicable to maintenance personnel only. This section is applicable to maintenance personnel only. Debug Parameter as shown as below: Selecting “Updater” displays the sub-menu shown below: →...
  • Page 26: Dsp Update

    6. Normal operation 7. Maintenance 6.7.14 DSP Update The function is used for update the DSP. Canadian Solar Three Phase Inverter does not require any regular maintenance. However, cleaning the dust on heat-sink will help the inverter to dissipate the heat and increase its life time.
  • Page 27: Fan Maintenance

    7. Maintenance 7. Maintenance 7.3 Surge Protection Device Maintenance If surge protection device is damaged, it will affect the safety of the inverter. It is necessary to NOTE: replace it with a new lightning protection module. If you need to maintain the inverter at night, please turn off the AC switch first, 1.
  • Page 28: Troubleshooting

    8. Troubleshooting 8. Troubleshooting The inverter is designed in accordance with the most important international grid-tied Alarm Message Failure description Solution standards and safety and electromagnetic compatibility requirements. Before delivering to INI-FAULT Initialization system fault the customer, the inverter has been subjected to several tests to ensure its optimal operation and reliability.
  • Page 29: Specifications

    8. Troubleshooting 9. Specifications Model CSI-125-T600GL02-E Alarm Message Failure description Solution Max. DC input voltage (Volts) 1500 INI-FAULT Initialization system fault Rated DC voltage (Volts) Comm. failure between Start-up voltage (Volts) DSP-B-FAULT 1.Restart inverter or contact installer. main and slave DSP MPPT voltage range (Volts) 860...1450 12V power supply fault...
  • Page 30: Appendices

    10. Appendices 10. Appendices Recommended Combiner Model and Specifications. Product Name PV Combiner Box Model LM-PVSZ-CV-G20 Rated voltage(V DC) 1500 Max. Number of DC input strings Number of DC output 0.78 Max. input current per string(A) 12.5(20A Fuse) Max. continuous output current(A) 250(MCCB 315A) Strings wire (mm²) 40*(4~6)
  • Page 31 PROJECT NAME LOCATION NUMBER INSTALLATION AND 3 PHASE STRING INVERTERS (SERIES) COMMISSIONING CHECKLIST Warning: This checklist is not a replacement for the user manual. Please read the user manual prior to inverter site selection and installation. Step Content Details Values / Notes Conclusion Installation Ensure installation site meets environmental and...
  • Page 32 PROJECT NAME LOCATION NUMBER INSTALLATION AND 3 PHASE STRING INVERTERS (SERIES) COMMISSIONING CHECKLIST Warning: This checklist is not a replacement for the user manual. Please read the user manual prior to inverter site selection and installation. Step Content Details Values / Notes Conclusion Communication cable (if function...
  • Page 33 PROJECT NAME LOCATION NUMBER INSTALLATION AND 3 PHASE STRING INVERTERS (SERIES) COMMISSIONING CHECKLIST Warning: This checklist is not a replacement for the user manual. Please read the user manual prior to inverter site selection and installation. Step Content Details Values / Notes Conclusion After 60-300 seconds (depending on local requirement), the inverter will start to generate power.
  • Page 34 PROJECT NAME LOCATION NUMBER INSTALLATION AND 3 PHASE STRING INVERTERS (SERIES) COMMISSIONING CHECKLIST Warning: This checklist is not a replacement for the user manual. Please read the user manual prior to inverter site selection and installation. System Owner: Address / Location: Note site typical arrangements and variances Inverter model: Inverter firmware revision: DSP:...
  • Page 35 PROJECT NAME LOCATION NUMBER INSTALLATION AND 3 PHASE STRING INVERTERS (SERIES) COMMISSIONING CHECKLIST Warning: This checklist is not a replacement for the user manual. Please read the user manual prior to inverter site selection and installation. Inverter serial numbers: INSTALLER´S NAME COMPANY INSTALLER´S SIGNATURE DATE...

Table of Contents