Commissioning The Equipment; Rectifiers And Alarms - Alcatel-Lucent 7310 Installation Manual

Metro cell cabinet
Table of Contents

Advertisement

A
-L
7310 M
LCATEL
UCENT
ETRO

Commissioning the Equipment

Name
Alcatel-Lucent 9764 Metro Cell Outdoor V1.0 2x5W B13 LTE Hardware
Installation Document
Alcatel-Lucent 7705 Service Aggregation Router, Release 6.0 R2,
SAR-W Chassis Installation Guide

Rectifiers and Alarms

≡≡
To commission the DC rectifiers and alarms
Open the rectifier cabinet door.
1
Insert each rectifier into the appropriate slot in the DC power plant.
2
WARNING
Ensure there is no gap between rectifier face and rectifier shelf.
WARNING
Potential Equipment Damage
Ensure battery temperature probe and LAN cable are installed in the correction location
on the DC power plant. Reversing the cables may result in damage to the DC power plant.
56
C
C
I
M
ELL
ABINET
NSTALLATION
LAN and Temp Probe Cable Locations on DC Power Plant
ANUAL
Temp Probe
Cable Location
LAN Cable Location
Part Number
3MN-01714-0002-RJZZA
3HE-07727-AAAB-TQZZA

Advertisement

Table of Contents
loading

Table of Contents