Download Print this page

Advertisement

Quick Links

Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your
local building permit office to determine the correct hardware in your area.
If you plan to paint or stain your Pergola before assembly, be sure to scribe or mark the
top edge of Joist where Stub Joists and Ladder Blockings are pre-marked. Painting or
staining may cover up markings, making it more difficult to align components later.
Customers agree to hold Outdoor Living Today and any Authorized Dealers free of any
liability for improper installation, maintenance and repair of any Outdoor Living Today
products.
In the event of a missing or broken piece, simply call the Outdoor Living Today
Customer Support Line @ 1-888-658-1658 within 30 days of the delivery of your
purchase. It is our commitment to you to courier replacement parts, free of charge,
within 10 business days of this notification. Replacement parts will not be
provided free of charge after the 30 day grace period.
Toll Free 1-888-658-1658
12ft X 16ft Breeze Pergola
Assembly Manual
Outdoor Living Today
www.outdoorlivingtoday.com
Page 1
Revision #8
March 20th, 2012
sales@outdoorlivingtoday.com

Advertisement

loading

Summary of Contents for OLT 12ft X 16ft Breeze Pergola

  • Page 1 12ft X 16ft Breeze Pergola Assembly Manual Outdoor Living Today Revision #8 March 20th, 2012 Note: Post Mounting Hardware is NOT included in this kit. Please confirm with your local building permit office to determine the correct hardware in your area.
  • Page 2 12X16 BREEZE PERGOLA EXPLODED VIEW 6 LADDER SECTIONS 87 3/4” Inside Post to Post 133” Inside Post to Post 96” Outside Post to Center of Center Post 144” OUTSIDE POST TO POST 192” OUTSIDE POST TO POST Thank you for purchasing one of our Breeze Pergola's.
  • Page 3: Hardware Kit

    12x16 BREEZE PERGOLA HARDWARE PACKAGE Hardware Kit (Provided) Note: screws and nails shown actual size. 4” Square 2 1/2” Drive Bit Wooden 1 1/4” Dowel (12) 2” 2” SS Stainless Finishing Nail Lag Screw and Washer (24 each) Tools Required (Not Provided) Wood Clamp Hammer...
  • Page 4 Laying out your Footprint To determine the proper placement of your 5 3/8” x 5 3/8” Posts, see the exploded view on Page 2 to find the measurements and to determine their correct positions. Outside Post to Post measurements for the 12’x16’ Breeze are: 192”...
  • Page 5 Important: you will need the help Girder (B) to outside of 2-3 people while lifting and positioning the completed Post/Side Girder Sections into place. Lift up a completed Post/Girder Section slowly and carefully. Make sure B-Girders are facing outward. If Post Mount Hardware is installed, position bottom of Posts in Hardware.
  • Page 6 Carefully slide C-Girder up into notch of B-Girders. Be careful not to twist the Girder when pushing up into place. Lag Screw with Washers (2) the C-Girder to Post when both pieces are flush with each other. Lift, position and Lag screw the opposite C-Girder to Posts.
  • Page 7 There are two Joist/Stub Joist Completed Joist/ Stub Joist Assembly. Assembly’s, complete both now. Completed Joist/Stub Joist connections. Carefully lift up completed Joist/Stub Joist Assembly and fit notches onto Girder. 1 - 4” screw Attach all Stub Joists and Joist to Girder with 1 - 4”...
  • Page 8 On a flat surface, position Ladder Blocking (F) where marked on Main Joist (D) and screw with 2 - 2 1/2” screws per piece. Blocking should be flush with top and bottom of Main Joist with all notches facing down. 2 - 2 1/2”...
  • Page 9 Notch slides onto Girder Carefully slide Joist notches of Ladder Section onto Girder. Try to align notches so they fall into place all at once. With notches of Ladder Section all sitting correctly on Girder, slide Section approximately 7” from Post.
  • Page 10 (H) Right Side There are 6 Left (G) and 6 Right Sided Bracket Brackets (H). Corner Bracket Post Mounts (I) must be attached to the bottom end of each Corner Bracket before attaching to Posts. Wooden Dowel (I) Corner Bracket Post Mounts Hole...
  • Page 11 4” screws countersunk 1/2” below surface. Bracket Left Sided Bracket Spacer flush with bottom of Girder. Important: Posts may need to be aligned so they are true and square to mount Corner Brackets correctly. Use a Level to determine correct Post position. Lift completed Left Sided Bracket up and align bottom of Bracket Spacer flush with bottom of Girder.
  • Page 12 Complete both the left and right Brackets on each remaining center post. Once again, make sure both brackets are centered on post and are the same height as the outside corner brackets. 12x16 Breeze with all Brackets attached. Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com Page 12...
  • Page 13 Post Post Skirtings with Cleat (J) Skirting dado cut dado cut Caps (L) Post Skirting with Cleat (J) Post Skirtings - (K) Post Mount To complete your Breeze, position 2 Post Skirtings with Cleats (J) on opposite sides of Post with Dado cuts facing to the inside as shown above.
  • Page 14 Congratulations on building your 12X16 Breeze Pergola Note: Our Pergola's are shipped as an unfinished product. If exposed to the elements, the Western Red Cedar lumber will weather to a silvery-gray color. If you prefer to keep the cedar lumber looking closer to the original color, we suggest that you treat the wood with a good oil based wood stain.