Download Print this page
HP EliteBook x360 1030 G2 Product End-Of-Life Disassembly Instructions

HP EliteBook x360 1030 G2 Product End-Of-Life Disassembly Instructions

Notebook pc
Hide thumbs Also See for EliteBook x360 1030 G2:

Advertisement

Quick Links

Product End-of-Life Disassembly Instructions
Product Category: Notebooks and Tablet PCs
Marketing Name / Model
[List multiple models if applicable.]
HP EliteBook x360 1030 G2 Notebook PC
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions
for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU
directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as
applicable.
Item Description
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
Batteries
Mercury-containing components
Liquid Crystal Displays (LCD) with a surface
greater than 100 sq cm
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring
greater than 2.5 cm in diameter or height
External electrical cables and cords
Gas Discharge Lamps
Plastics containing Brominated Flame Retardants
weighing > 25 grams (not including PCBs or PCAs
already listed as a separate item above)
Components and parts containing toner and ink,
including liquids, semi-liquids (gel/paste) and toner
Components and waste containing asbestos
EL-MF877-00
Template Revision B
Notes
With a surface greater than 10 sq cm
All types including standard alkaline and lithium
coin or button style batteries
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Includes background illuminated displays with gas
discharge lamps
Include the cartridges, print heads, tubes, vent
chambers, and service stations.
PSG instructions for this template are available at
EL-MF877-01
Quantity
of items
included
in product
2
1
0
1
0
0
0
1
0
0
0
0
Page 1

Advertisement

loading

Summary of Contents for HP EliteBook x360 1030 G2

  • Page 1 Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
  • Page 2 Components, parts and materials containing refractory ceramic fibers Components, parts and materials containing radioactive substances 2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed.
  • Page 3 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Oldman Tabulator: Tzan.Uen-Tung Auditor : Tzan.Uen-Tung...
  • Page 4 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 1(1/1) Station : 1.00 2016/12/05 Name Ver. : Date Disassemble BTCB Step: 1. Loosen BTCB Screws * 5 2. Disassemble BTCB Fig1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver T5...
  • Page 5 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 2(1/1) Station : 1.00 2016/12/05 Name Ver. : Date Disassemble Battery CNTR &mylar Step: 1. Disassmble battery cable CNTR 2. Disassmble M/B mylar 3. Disassmble Wlan mylar Fig1 Fig3 Fig2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 6 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 3(1/1) Station : 1.00 2016/12/05 Name Ver. : Date Disassemble SSD & Battery Step: 1. Loosen SSD CARD Screws*1 (Fig1), 2. Disassemble SSD . 3. Loosen Battery Screws** 6 4. Disassemble Battery ,Fig2 Fig1 Fig2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 7 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 4(1/1) Station : 1.00 2016/12/05 Name Disassemble NFC Ver. : Date Step: 1. Disassemble NFC module Gasket,Fig1. 2. Disassemble NFC module .Fig2 Fig1 Fig2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 8 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 5(1/1) Station : Disassemble FPC 1.00 2016/12/05 Name Ver. : Date Step: 1. Disassemble FP FPC ,Fig1 2. Disassemble audio FFC,Fig2 3. Disassemble smart card FPC ,Fig3 Fig1 Fig3 Fig2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 9 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 6(1/1) Station : 1.00 2016/12/05 Name Ver. : Date Disassemble WLAN&camera cable Step: 1. Disassemble WLAN Antenna (Fig1) 2. Disassemble hinge Screws 3. Disassemble IR cable(Fig2/3) 4. Disassemble camera cable CNTR,Fig4 Fig1 Fig2 Fig3...
  • Page 10 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 7(1/1) Station : 1.00 Disassemble WWAN 2016/12/05 Name Ver. : Date Step: 1. Disassemble WWAN Antenna (Fig1) 2. Loosen Screws *1 . 3.Disassemble WWAN module(Fig2) Fig2 Fig1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 11 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 8 (1/1) Station : 1.00 Disassemble LVDS Cable 2016/12/05 Name Ver. : Date Step: 1. Loosen Screws *1 , 2. Disassemble LVDS Cable Fig1 Fig2 Fig3 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 12 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 9(1/1) Station : 1.00 2016/12/05 Name Ver. : Date Disassemble FAN Step: 1. Disassemble KB FFC & backlight FPC(Fig1/2) 2. Disassemble FAN cable TAPE ,Fig3 3. Loosen Screws *2 & CNTR 4.
  • Page 13 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 10(1/1) Station : 1.00 Disassemble speaker 2016/12/05 Name Ver. : Date 1. Loosen Speaker Screws *2,Fig1/2 Step: 2. Disassemble Speaker CNTR, Disassemble Speaker,Fig3 Fig2 Fig1 Fig3 speaker Fig4 CNTR Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 14 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 11(1/1) Station : 1.00 2016/12/05 Name Ver. : Date Disassemble M/B Step: 1. Loosen M/B Screws *7 (Fig1/2) 2. Disassemble M/B Fig1 Fig2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 15 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP Station : 12(1/1) 1.00 2016/12/05 Name Ver. : Date Disassemble thermal sensor/B Step: 1.Loosen Thermal sensor/B Screws * 4(Fig1) 2.Disassemble thermal sensor FFC CNTR 3.Disassemble FFC 4.Disassemble thermal sensor/B(Fig2) Fig1 Fig2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 16 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 13(1/1) Station : 1.00 Disassemble Wlan antenna 2016/12/05 Name Ver. : Date Step: 1. Disassemble Wlan antenna (Fig1) 2. Loosen Screws * 2 (Fig2) Fig2 Fig1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 17 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 14(1/1) Station : 1.00 2016/12/05 Name Ver. : Date Disassemble Audio/B,FP Step: 1. Disassemble Audio/B screw& (Fig1) 2. Disassemble FP screw & breaket & FP.Fig2 Fig1 Fig2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 18 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 15(1/1) Station : 1.00 2016/12/05 Name Ver. : Date Disassemble Smart /B Step: 1. Loosen Screws * 2 (Fig1) 2. Disassemble smart card FFC, 3. Disassemble smart card/B ,Fig2 Fig1 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 19 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 16(1/1) Station : 1.00 2016/12/05 Name Disassemble LCM Ver. : Date Step: 1. Disassemble hinge screws * 6 2. Disassemble LCM Fig1/2  扭力值:2.5 ± 0.1Kgf.cm Fig1 Fig2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 20 Standard Operation Procedure Document No. Oldman FA DIS ASS’Y SOP 17(1/1) Station : 1.00 2016/12/05 Name Ver. : Date DisassembleClick pad Step: 1. Disassemble Click pad BRKT Screws * 4 2. Disassemble click pad (Fig1) Fig1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...