Download Print this page

Programming Indiviual Energizers - Nemtek MERLIN STEALTH MASTER Installer Manual

Hide thumbs Also See for MERLIN STEALTH MASTER:

Advertisement

10
MERLIN STEALTH MASTER
Programming the energizers
PROGRAMMING THE INDIVIDUAL ENERGIZERS
After the network is programmed the Master and Slave units can now individual be
programmed to suit the requirements i.e. gate delay times, siren on times, fence alarm
voltage etc.
If at some stage the network has to be reprogrammed these individual setting will fall back
to the factory setting when the units are defaulted and have to be reprogrammed.
CAUTION
The Merlin Stealth Range, when programmed to be part of a synchronized
energizer network: configures the energizer energy output with the assumption
that only one other correctly programmed energizer, of the same network, may
be touched simultaneously and still remain within the current limited energizer
limits as defined in the IEC 60335-2-76
In other words if a synchronized work is selected the networking program will assume that a
person can touch two fences at the same time and to stay legal the output energy is reduced
during the network programming to half of the maximum energy of the energizer.
If three fences supplied by three different energizers of the same synchronized network
would be within 2.5 meter of each other, the output energy of each of the energizers would
have to be individually reprogrammed to one third of the maximum energy of the energizers
to stay legal.
If an electric fence of a synchronized network is more than 2.5 meter away from other
electric fences the output energy of the energizer supplying that fence can be individual
reprogrammed to the maximum output of the energizer.
Refer to the appropriate regulations and laws pertaining to the installation of
electric fences.

Advertisement

loading
Need help?

Need help?

Do you have a question about the MERLIN STEALTH MASTER and is the answer not in the manual?

Questions and answers