CERTIFIED TO CSA STD TIL NO. A-40 PHOTOVOLTAIC MODULE RACKING SYSTEMS • Load Rating: 2400 PA [50 PSF] AIRE RAILS CERTIFIED TO CSA STD C22.2 #126.1 METAL CABLE TRAY SYSTEMS • Conforms to NEMA VE1 • Rail Internal Cross Section: 2in²...
TILE BONDING HARDWARE TORQUE VALUES Please refer to each attachment's individual section for full details on all torque values and instructions. 3/8" Aire Dock Bolt (1/2" Socket): 250 in-lbs ☐ Aire All Tile Hook and Knockout Tile QM Tile Replacement ☐...
Rail. Do not torque until after Rail has been installed. ➢ Aire dock can be installed on the upslope or downslope side of a roof attachment. ➢ For steeper roof pitches greater than 8/12 (33 degs) It is recommended that Aire dock be installed on the upslope side.
Aire Lug Insert Aire Lug into Rail and twist quarter-turn clockwise to engage with Rail. Install a 10-6 AWG solid copper or stranded grounding wire. Torque pre-assembled Terminal Bolt to 144 in-lbs securing wire to Lug and Lug to Rail.
C. Secure Aire Lock Stealth Secure the clamp to module frame and Rail by torquing the Aire Lock Stealth bolt. Pull the clamp tether as you torque the clamp bolt into place, ensuring the clamp remains in Torque to...
Slide second Rail over Aire Tie to the second Expansion Joint Alignment Mark, leaving a 1" gap between the Rails. Torque only one side of the Aire Tie, securing to Rail. Torque to 144 in-lbs. B. Ensure 1" gap No Modules There must be a minimum 1"...
7/16" Socket drive Lag Bolt until fully seated. FlashVue is now installed and ready for IronRidge Aire Rails. Attach rails to either side of the open slot using Aire Dock. Level rail at desired height, then torque to 250 in-lbs (21 ft-lbs).
Page 12
➢ For complete installation requirements and limitations, please refer to the HUG Installation Manual. ➢ HUG is only approved for installation with IronRidge RD Structural Screws. ➢ HUG cannot be installed between courses. HUG (DECK) Confirm shingle step does not exceed 1/8”. Locate and mark attachment locations.
Prepare lag bolt or structural screw with sealing washer. Use 1/2" socket to drive prepared lag bolt through L-foot until fully seated and L-foot can no longer rotate easily. Attach rail to L-Foot with Aire Dock and torque to 250 in-lbs (21 ft-lbs). ➢...
Page 14
L-Foot in Dimple desired orientation and torque hardware to 132 in-lbs (11 ft-lbs). Attach rail to L-Foot with Aire Dock and torque to 250 in-lbs (21 ft-lbs). ➢ Base can be installed in any orientation relative to rafter.
CABLE TRAY SYSTEM The Aire Rails and Air Ties are certified for use as a Cable Tray System per NEMA VE1/CSA C22.2 #126.1. Wires may be routed in the Rail as a Cable Tray. Route all wires in Rail near module frame edge and avoid routing wires underneath the center of the module.
Attach MLPE to Rail via MLPE Mount Slide the MLPE mounting bracket between the top of the Rail and the bottom side of the Aire MLPE bolt flange. Secure the assembly to the Rail by tightening the bolt. Torque to 144 in-lbs.
(or shorter) and has a splice attached on one end, on which the section of trim the 12" section is spliced to also has 2 clamps. ➢ Contour Trim when installed when installed up roof requires the use of Aire Stealth Clamps. ➢ Wind Speed: no restrictions ➢...
MODULE COMPATIBILITY The Aire System has been tested and evaluated to UL 2703 for bonding, grounding, mechanical loading and fire classification, and may be used to ground and/or mount PV modules listed to UL 1703 or UL 61730. A list of approved modules is included below. Unless otherwise noted, “xxx”...
Need help?
Do you have a question about the AIRE and is the answer not in the manual?
Questions and answers