Download Print this page

Advertisement

Quick Links

STEP 1 - MAIN POWER
• Verify shelter's power provides 100-140- VAC
• Check for damage or loose connections that may have occured during shipping
or storage
• The location of the control system should be near the main entrance next to
the power distribution box
• Connect the systems power cable to the shelter power (shore power) and hang
the sling on the shelter wall
WARNING!
DO NOT force the connectors together!
The connectors are keyed to align the positive and negative terminals.
Damage to the connectors may result!
FD9 System Components
• Hanging Strap
• Kit Bag
• Protected Control system
• Internal Power Supply
• LED Lighting
• Hanging System
• Connectors
STEP 2 - PREPARING YOUR LIGHTS
• Unfurl the lights before illuminating
• The lights come pre-installed with a hanging system
• To adjust the hanging system see "STEP 3 - Adjusting the hanging system"
WARNING!
lluminating the lights when rolled may
I
result in damage to the lights!
Examples:
NOTE some configurations may require a "Y" cable
Standard
Multiline
Barracks

Advertisement

loading
Need help?

Need help?

Do you have a question about the FD9 and is the answer not in the manual?

Questions and answers

Summary of Contents for FrontLine FD9

  • Page 1 FD9 System Components • Hanging Strap • Kit Bag • Protected Control system • Internal Power Supply • LED Lighting • Hanging System • Connectors STEP 1 - MAIN POWER STEP 2 - PREPARING YOUR LIGHTS • Verify shelter's power provides 100-140- VAC •...
  • Page 2 STEP 4 - STORAGE • Turn lights on for a short perod of time and then re-align the LED’s to face in • The FD9 can be coiled and stored like a typical extension the desired direction. cord and then stored inside the kit bag •...