STEP 1 - MAIN POWER
• Verify shelter's power provides 100-140- VAC
• Check for damage or loose connections that may have occured during shipping
or storage
• The location of the control system should be near the main entrance next to
the power distribution box
• Connect the systems power cable to the shelter power (shore power) and hang
the sling on the shelter wall
WARNING!
DO NOT force the connectors together!
The connectors are keyed to align the positive and negative terminals.
Damage to the connectors may result!
X27 System Components
• Hanging Strap
• Control System
• Power Cable
• LED Lighting
• Power Supply
"Y" Cable
(Optional)
• Locking Connectors
• Multi Line
STEP 2 - PREPARING YOUR LIGHTS
• Remove the lights from the sling system
• Unfurl the lights before illuminating
• To adjust the hanging system see "STEP 3 - Adjusting the hanging system"
WARNING!
lluminating the lights when rolled may
I
result in damage to the lights!
Examples:
NOTE some configurations may require a "Y" cable
Standard
Multiline
Barracks

Advertisement

loading
Need help?

Need help?

Do you have a question about the X27 and is the answer not in the manual?

Questions and answers

Summary of Contents for FrontLine X27

  • Page 1 X27 System Components • Hanging Strap • Control System • Power Cable • LED Lighting • Power Supply “Y” Cable (Optional) • Locking Connectors • Multi Line STEP 1 - MAIN POWER STEP 2 - PREPARING YOUR LIGHTS • Verify shelter's power provides 100-140- VAC •...
  • Page 2 STEP 5 - STORAGE • Turn lights on for a short perod of time and then re-align the LED’s to face in • The X27 can be coiled and stored like a typical exten- the desired direction. sion cord and then strapped into the harness using the •...