2.
When cooling cabinet is in place, set and secure the
furnace according to the instructions that are provided
with the cooling coil. Secure the furnace to the cabinet.
3.
Seal the cabinet and check for air leaks.
Return Air Opening - Downflow Units
Return air may be brought in only through the top opening of
a furnace installed in the downflow position. The following
steps should be taken when installing plenum:
1. Bottom edge of plenum should be flanged with a
hemmed edge (see Figure 17 or Figure 18).
2.
Sealing strips should be used to ensure an airtight
seal between the cabinet and the plenum.
3.
In all cases, plenum should be secured to top of
furnace using sheet metal screws.
4.
Make certain that an adequate seal is made.
PLENUM
(Field Provided)
SEALING STRIP
(Field Provided)
Side View
Figure 17.
PLENUM
(Field Provided)
SECURE FROM
INSIDE CABINET
Side View
Figure 18.

Filters

This unit is not equipped with a filter or rack. A field provided
filter is required for the unit to operate properly. Table 3 lists
recommended filter sizes.
A filter must be in place whenever the unit is operating.
Furnace Cabinet Width
B (17.5")
C (21")
Table 3. Filter Size
Page 12 of 55
SECURE FROM
OUTSIDE CABINET
CABINET
SIDE PANEL
SEALING STRIP
(Field Provided)
CABINET
SIDE PANEL
Filter Size
16 x 25 x 1 (1)
Issue 2223

Duct System

Use industry-approved standards to size and install the
supply and return air duct system. This will result in a quiet
and low-static system that has uniform air distribution.
NOTE: This furnace is not certified for operation in heating
mode (indoor blower operating at selected heating speed)
with an external static pressure which exceeds 0.5 inches
w.c. Operation at these conditions may result in improper
limit operation.
Supply Air Plenum
If the furnace is installed without a cooling coil, a removable
access panel should be installed in the supply air duct. The
access panel should be large enough to permit inspection
(by reflected light) of the heat exchanger for leaks after the
furnace is installed. The furnace access panel must always
be in place when the furnace is operating and it must not
allow leaks into the supply air duct system.
Return Air Plenum
NOTE: Return air must not be drawn from a room where
this furnace, or any other gas-fueled appliance (i.e., water
heater), or carbon monoxide-producing device (i.e., wood
fireplace) is installed.
When return air is drawn from a room, a negative pressure
is created in the room. If a gas appliance is operating in
a room with negative pressure, the flue products can be
pulled back down the vent pipe and into the room. This
reverse flow of the flue gas may result in incomplete
combustion and the formation of carbon monoxide gas.
This toxic gas might then be distributed throughout the
house by the furnace duct system.
Use fiberglass sealing strips, caulking, or equivalent
sealing method between the plenum and the furnace
cabinet to ensure a tight seal. If a filter is installed, size the
return air duct to fit the filter frame.
Pipe & Fittings Specifications
All pipe, fittings, primer and solvent cement must conform
with American National Standard Institute and the American
Society for Testing and Materials (ANSI/ASTM) standards.
The solvent shall be free flowing and contain no lumps,
undissolved particles or any foreign matter that adversely
affects the joint strength or chemical resistance of the
cement. The cement shall show no gelation, stratification,
or separation that cannot be removed by stirring. Refer to
Table 4 below for approved piping and fitting materials.
507769-05G / 31-5000656