Summary of Contents for CAC / BDP HUM STM3034 Series
Page 1
Residential Steam Humidifier Model HUMCRSTM3134, HUMXXSTM3034, HUMXXSTM3134 Residential Steam Humidifier Owner’s Manual Includes Safety & Operating Instructions READ AND SAVE THESE INSTRUCTIONS...
INTRODUCTION FIGURE 1 – Fill and Drain System and Canister Thank you for your recent steam humidifier purchase . We appreciate Steam your business and are pleased to add your name to our growing list of Outlet customers . You have invested in the highest quality equipment available . Your humidifier will require periodic maintenance to assure continued Fill Cup consistent performance .
INSTALLATION OPTIONS AND EFFECT OF OPERATING MODES WATER CHARACTERISTICS When the humidifier is powered and turned on, the “On/Off” light is illuminated green . Your Steam Humidifier can be installed to operate on 120 volts, 208 volts or 240 volts using 11 .5 or 16 .0 amps . The higher the voltage and amperage When the canister is being filled or replenished with water, the “Fill”...
DISPLAY PANEL HUMIDIFIER CONTROL & OPERATING INSTRUCTIONS The control provided with your humidifier is mounted either in your return TABLE 1 – Display Panel air duct or on a wall in the living space . The control has a set of contacts which close when the RH is below the set point .
CHECK THE HUMIDIFIER OPERATION INSPECT HUMIDIFIER WHEN SERVICING • Replace the canister annually and when prompted by the “Service” light Turn the control knob to the maximum RH setting . Make sure that the • Clean drain valve and fill valve screen annually water saddle valve is open and that the humidifier is on .
Page 7
3 . Inspect the two electrode wires (see ELECTRODE WIRE REPLACEMENT 12 . Make sure strainer is inserted into bottom of new canister . section for detailed instructions) . 13 . Insert new canister into drain assembly (see FIGURE 5) . Replace them if they are: 14 .
Page 8
ELECTRODE WIRE REPLACEMENT FILL VALVE SERVICE 1 . Remove front panel (see FIGURE 2) . 1 . Disconnect water supply line from fill valve inlet (see FIGURE 5) . 2 . Remove side panel (see FIGURE 2) . 2 . Remove in-line strainer from the fill valve inlet port using a #8 or #10 sheet metal or wood screw with a minimum length of 0 .5”...