 A junction box is required to install the down tower cable with the armored
cable that is protruding from the 15KW tower adapter. This will also require
a source for connecting the wires, Bergey WindPower recommend Polaris
IT-4 connections.
 The inverter fans are controlled by a thermostat, the dump load fans run
continually
 Upon initial commissioning ensure the Emergency stop is pulled out
 Use a 100 amp breaker for the grid side connection. If the panel cannot
support this size of breaker consult a local electrician to see if a line side tap
is an option.
 Generally the XL15 is going to require a specific mounting plate to make the
attachment to the tower, tower attachment hardware is not supplied with
the turbine, it is supplied in the adapter plate kit, contact the BWC Sales
Department to find out if a premade kit is available for your application
 Dumpload must be installed vertically with chimney facing "up"
REV 0.1

ADDITIONAL INFORMATION

Page 28 of 28