APPLYING A PHASE TO PHASE SHORT

At this time a phase to phase short should be applied in the down tower
disconnect box. Use two 10 gauge solid strand wires to jump between the
bottoms of the fuses as shown below. This short should be left in place until the
system is commissioned.