Page 3
PARTS LIST PART NO. DESCRIPTION IMAGE QUANTITY. SIZE ITEM NO. S1/HS FRAME 4 x 40 BRACKET 3 x 4 PLATE/ 3 x 1 BRACKET NBBS S1 STUB 8 x 1 8 x 1 BRACKET 3 x 1 PLATE/ 8 x 1 BRACKET CURVED 85 x 1...
Page 4
Step 1 Assemble S1 frames to make up the main structure using CB1 brackets in the corners and JF1 brackets on the straight joints. Attach the S1 stub as shown using JF1 brackets. GENERAL NOTE: THE 2" TECH SCREWS ARE FOR FIXING ROOF STRIPS (RC) ONLY...
Page 5
Step 2 Attach R5 rafters using RB2 brackets on the back of the shelter and JF2 brackets in the middle. S1 STUB DETAIL...
Page 6
Step 3 Assemble the T-frame using two ST9 tie bars and a P4 post. Join the two ST9 bars together first using JF3 brackets, then attach the P4 post using two RB2 brackets.
Page 7
Step 4 Use L1 brackets to attach the T-bar to the front of the shelter and install the R4 rafters using RB2 brackets on the rear and L1 brackets at the front. Attach the FT1 brackets and move the shelter in to its final position before using anchor bolts to secure it to the ground.
Page 8
Step 5 Stick sealing strips (SS) to the rafters and align the PCE2 panels to the outside of the shelter and centralise the PCC2 panel in the centre. PCE2 PCC2 PCE2 SS SS SS SS SS SS...
Page 9
Step 6 Screw down the RC2 strips to secure the roof panels and clip on the 2MD edge trim to the bottom of the roof panels. Then fit the Black plastic caps on exposed nuts and bolts. Fit the square end caps to any open ends of box sections.
Page 11
PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS 39" 5" 37" 87" Suggested size for concrete base: 200mm oversized on all sides...
Page 12
Touch up any exposed metal should it get scratched CONTACT DETAILS: Email : Sales@nobutts.com Web : www.nobutts.com Tel : 1-888-662-8887 No Butts Bin Company, Inc. 16 Birch Lane, Madison, CT 06443 All Parts and Fixings checked by: Print Name: Signature:...