PARTS LIST PART MEASUREMENT MEASURMENTS ITEM DESCRIPTION IMAGE QTY. (MM) (INCHES) FRAME 2000 x 1035 78.74 x 40.55 FRAME 2000 x 517 78.74 x 20.35 PLATE / BRACKET 220 x 40 8.66 x 1.57 BRACKET 110 x 110 4.33 x 4.33 4.29 x 3.93 x FOOT BRACKET 109 x 100 x 40...
Page 4
Step 1 Assemble S1 and S3 frames to make up the main structure using CB1 brackets for the corners and JF1 brackets for the straight joints. MEASUREMENTS IN BLUE - MM MEASUREMENTS IN GREEN - INCHES Use measurements to ensure correct alignment Make sure corners are correctly aligned.
Page 5
Step 2 Attach the R3 end rafters using L3 brackets at the front and RB1 brackets for the rear. DETAIL A SCALE 1 : 4...
Page 6
Step 3 Assemble the T - section by attaching the B4 ties to the P3 post using RB2 and JF3 brackets. T - section DETAIL B SCALE 1 : 3...
Page 7
Step 4 Attach T-section using L1 brackets. DETAIL C SCALE 1 : 6...
Page 8
Step 5 Move the shelter to its final position and make sure it is square and level. Then attach the FT1 and FT3 foot brackets and use anchor bolts to secure the structure to the ground.
Page 9
Step 6 Apply Sealing strips (SS) to the rafters and line up the PCE1 roof panels with the outside of the shelter and equally space the PCC1 panels between the outer panels. PCE1 PCC1 PCC1 PCE1 PCE1 PCC1 PCC1 PCE1...
Page 10
Step 7 Screw down the RC1 strips using the 38mm Tech screws to secure the roof panels in place. Then push the 2MD edge trim on to the bottom edge of the roof panels. Fit Black plastic caps on exposed nuts and bolts and fit the square plastic end caps to any open ends of box section.
PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base: 200mm/7.87in oversized on all four sides. 1139 44.85 18.78 20.73 526.50...
Touch up any exposed metal should it get scratched CONTACT DETAILS: Email : Sales@nobutts.com Web : www.nobutts.com Tel : 1-888-662-8887 No Butts Bin Company, Inc. 16 Birch Lane, Madison, CT 06443 All Parts and Fixings checked by: Print Name: Signature:...