Download Print this page

Keg King Fermenter King Junior Instruction Manual page 2

20l pressure fermenter keg

Advertisement

Available languages

Available languages

1.
Clean wash and sanitise the tank at
temperatures below 50°C (122F). Do not
(122F)
2.
Cleaners must be diluted to suitable
concentrations before use. If extended
contact time is expected, then users
must ensure that cleaners are chemically
compatible with PET, Silicone, EPDM,
Polypropylene
and
Approved cleaners and sanitisers for use
on this fermenter include: ABC (Part code
9006) Sodium Percarbonate (Part codes
6172, 6141) Sodium Metasilicate (Part
code RET4533) Atomic 15 Foaming (Part
code 9001) Atomic 15 Annihilator (Part
code 9002) or Phosphoric acid-based
sanitisers.
3.
Do not apply more than 2.4 bar (35 psi) to
the tank under any circumstance.
4.
NEVER
connect
pressure source.
5.
If you connect an external pressure
source; ensure it has an independent
PRESSURE LID ASSEMBLY INSTRUCTIONS
1.
Clean and sanitise all components prior to
assembly.
2.
Thread the red pressure release valve into
3.
Ensure that the gas and liquid bulkhead
post fully tightened onto the Pressure Lid.
the pressure lid and tighten the locknuts.
O-rings should be located on the top
surface of the lid for correct sealing.
4.
Lubricate the silicone dip tube with some
non-rinse sanitiser and slide one end over
Slide the other end of the silicon tube over
WARNINGS
50°C
6.
7.
8.
Stainless
Steel.
9.
10. Keep the tank out of direct sunlight
11. The tank is pressure tested at
to
an
unregulated
pressure release valve (PRV) pre-set
to below 2.4 bar (35 psi).
Use only the RED pressure release
valve supplied by MCH Australia Pty
Ltd on the pressure lid.
Do not tamper with the pressure relief
valve.
Do not use the tank under pressure
if it has been physically damaged i.e.
dropped on the ground
Do not expose to temperatures below
-2°C (28.5°F).
and other sources of UV radiation.
production and is marked with a date
for retesting. If it is being used under
pressure, then a hydrostatic test must
be conducted after every 24 months of
use to ensure that it is safe for reuse.
5.
Lubricate the entire silicone lid seal
to the underside of the Gravity Lid.
6.
Place the pressure lid on the mouth
of the Fermenter and ensure that the
seal seats correctly.
7.
Put a small amount of food grade
lubricant on the top outer ring of the
cap.
8.
Place the top thread ring over the lid

Advertisement

loading