Download Print this page

HanleyLED PHOENIXNRG STREAMLINER Quick Start Manual page 7

Advertisement

MAKE SURE PRIMARY POWER TO SIGN IS COMPLETELY SHUT OFF
STOP
TO THE CIRCUIT BEOFRE WORKING ON SIGN
RETROFIT INSTALLATION INSTRUCTIONS
hanleyledsolutions.com | 800.542.9941
PHOENIXNRG STREAMLINER INSTALLATION GUIDE
1.
Turn off primary power to sign. Double check primary with
appropriate test to ensure primary wires are not live.
Open cabinet.
2.
Disconnect ballasts from sockets and primary. Remove ballast
and fluorescent lamps. Leave enough lead wire on socket as you
will reconnect these to the primary in step 4.
3.
Leave fluorescent sockets in raceway. Inspect the sockets.
Ensure that they are clean and free of any damage. Replace any
damaged or compromised sockets to ensure that they do not
damage Streamliners. Since power passes through socket cap from
the socket, ensure that the metal prongs inside the socket are in
good condition and can make contact with the Streamliner cap.
4.
Connect UL approved surge protector by connecting black
wire (L) of surge protector to input (L) line from primary and white
wire (N) of surge protector to (N) neutral line from primary and
connect green wire (G) to the ground wire of cabinet.
*Only one SPD per circuit
Grimco, Inc. v. Principal Lighting Group, LLC
PLG Exhibit 2053
7
IPR2021-00968
Page 6

Advertisement

loading

Related Products for HanleyLED PHOENIXNRG STREAMLINER