Installation Information; Recommended Tools And Materials - Sub-Zero International PRO Series Manual

Table of Contents

Advertisement

Installation Information

RECOMMENDED TOOLS AND MATERIALS

Below is a list of tools and materials that should be
used during the installation of a Pro Series Unit.
• Appliance Dolly - able to support 454kg., with proper
manpower to handle weight.
• Moving blankets for protection of product and home.
• Masonite, plywood, 3,175 mm (minimum) pressed
fiberboard or some other suitable material for floor
protection.
• Copper tubing cutter
• 1220 mm of 6,35 mm OD copper tubing.
• Saddle valve for the water line (Part #4200880). (do
not use self-piercing valves)
• Cordless drill and assorted drill bits
• Phillips screwdriver set
• Slotted screwdriver set
• 6-Lobe (Torx) drive bits, or 6-Lobe screwdrivers
(Sizes: T-10, T-15, T-20, T-25)
• English Allen wrench set
• English socket wrench set, with socket extension of
at least 254 mm in length.
• English open-end wrench set
• Crescent wrenches
• Various sized pliers
• Carpenter's Levels of at least 0,6 m and 1,2 m in
length are recommended.
#7004858 - Revision A - April, 2007
International Pro-Series
International Pro-Series
(ICB648PRO)
(ICB648PRO)
2-2
Figure 2-1.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icb648pro

Table of Contents