Forest OVERLAP APEX LOG STORE Instructions

Advertisement

Quick Links

Making British gardens great
OVERLAP APEX LOG STORE
INSTRUCTIONS
We recommend using the following
tools (not supplied):
Tape Measure
Pozidrive
Screwdriver
PLEASE KEEP PLASTIC BAGS AND SMALL PARTS
AWAY FROM CHILDREN
1
Position the Floor in your desired location. Your log
store must be built on a solid and level base.
IMPORTANT
Assembly requires 2+
adults.
Missing something or need more information?
Call our aftersales team on
0333 321 3142
Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
EU Authorised Representative: Authorised Representative Service, 77 Camden Street Lower Dublin, D02 XE80, Ireland
Drill &
Sharp Knife
2-3mm Drill
Bits
FLOOR
FIXING PACK CONTAINS:
FIXING PACK CODE: OALGSTFP
Hammer
CHECK AND TIGHTEN ALL THE FIXINGS APPLIED TO
THIS PRODUCT ON A REGULAR BASIS.
2
Position and secure the Side Panel to the floor bearers
beneath. Ensure the panel is flush to the floor.
REMINDER
Always pre-drill before
screwing.
Visit our website for spare instructions and
more information
www.forestgarden.co.uk
ISSUE: 0122
50
SCREWS
SIDE PANEL
MM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OVERLAP APEX LOG STORE and is the answer not in the manual?

Questions and answers

Summary of Contents for Forest OVERLAP APEX LOG STORE

  • Page 1 Visit our website for spare instructions and more information Call our aftersales team on 0333 321 3142 www.forestgarden.co.uk Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB EU Authorised Representative: Authorised Representative Service, 77 Camden Street Lower Dublin, D02 XE80, Ireland...
  • Page 2 SCREWS SCREWS BACK PANEL SIDE PANEL Position and secure the Back Panel to the floor bearers Position and secure the other Side Panel to the floor beneath. Screw the Back Panel to the Side Panel. Ensure bearers beneath and the Back Panel. the corner of the adjoining panels are as shown above.
  • Page 3 INSIDE SCREWS ROOF PANEL Position your Roof Panels. Ensure they meet in the From the inside, secure the Roof Panels to the Apex middle of the apex and line up flush to each other. Boards to fix in place. Mark out where to pre-drill before securing into place.
  • Page 4 (e.g. painted), the manufacturer cannot be held liable for any resulting damage. The components provided may be heavy. Please lift with caution and with a minimum of 2 people Overlap Apex Log Store (OALGST) Label...
  • Page 5 HEALTH & SAFETY THE ROOF OF THIS LOG STORE IS NOT A LOAD BEARING STRUCTURE We strongly recommend that PPE (Personal Protective Equipment) is used throughout your build to ensure you are protected from any potential health and safety risks. Do not exempt yourself from wearing PPE. TREATED TIMBER CONTAINING A BIOCIDAL PRODUCT CONTROL OF WOOD DESTROYING ORGANISMS Active Ingredients - Propiconazole, Tebuconazole, IPBC, Permethrine, Benzyl-C12-16-Alkyldimethyl Chlorides.

Table of Contents