Forest HANBURY DOMED TOP ARCH Instructions

Advertisement

Making British gardens great
HANBURY DOMED TOP ARCH
INSTRUCTIONS
We recommend using the following
tools (not supplied):
Tape Measure
Pozidrive
Screwdriver
PLEASE KEEP PLASTIC BAGS AND SMALL PARTS
AWAY FROM CHILDREN
We strongly advise that you anchor your arch down with either fixtures shown below to enhance stability. You will need to
purchase these separately. Apply each fixture to each leg before fully constructing your arch. 130mm of your post will be supported
FOR PATIO/DECKING (HARD SURFACES)
Easy-Fit Fencebase - 65mm
(FBEF65)
IMPORTANT
Assembly requires 2+
adults.
It's vital that you build your new arch on a level ground in your desired location.
Missing something or need more information?
Call our aftersales team on
0333 321 3142
Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
EU Authorised Representative: Authorised Representative Service, 77 Camden Street Lower Dublin, D02 XE80, Ireland
Drill & 2-3mm
Ladder
Drill Bits

PREPARATION

within the fixture.
130mm
FIXING PACK CONTAINS:
FIXING PACK CODE: HANDTAFP
Rubber Mallet
CHECK AND TIGHTEN ALL THE FIXINGS APPLIED
TO THIS PRODUCT ON A REGULAR BASIS.
750mm
REMINDER
Always pre-drill before
screwing.
Visit our website for spare instructions and
more information
www.forestgarden.co.uk
ISSUE: 0122
4 x 80mm Screws
QTY: 5
4 x 60mm Screws
QTY: 4
FOR GRASS/SOIL
(SOFT SURFACES)
Easy-Fit Fencefast
(FEF6575)
Ensure that the spike can be
inserted into the ground by
750mm.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HANBURY DOMED TOP ARCH and is the answer not in the manual?

Questions and answers

Summary of Contents for Forest HANBURY DOMED TOP ARCH

  • Page 1 Visit our website for spare instructions and more information Call our aftersales team on 0333 321 3142 www.forestgarden.co.uk Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB EU Authorised Representative: Authorised Representative Service, 77 Camden Street Lower Dublin, D02 XE80, Ireland...
  • Page 2 SCREWS RIGHT POST CURVED RAFTER LEFT POST Lay out your Left and Right Posts on the floor. Position and secure the Curved Rafter to the Posts. Ensure the curve on the top is flush to the curve on the Posts when positioning as shown above. NOTCHED RAFTER SCREWS SCREWS...
  • Page 3 (e.g. painted), the manufacturer cannot be held liable for any resulting damage. The components provided may be heavy. Please lift with caution and with a minimum of 2 people Hanbury Domed Top Arch (HANDTA) Label...

Table of Contents