Making British gardens great
CALEDONIAN BASE'S
INSTRUCTIONS
We recommend using the following
tools (not supplied):
Tape Measure
Pozidrive
Screwdriver
PLEASE KEEP PLASTIC BAGS AND SMALL PARTS
AWAY FROM CHILDREN
CAL9090 & CALTRB9090 STEPS
Position and secure one Base to the edge of your
Caledonian. We recommend attaching your Base's to the first
tier before fully assemblying your Caledonian.
IMPORTANT
Assembly requires 2+
adults.
Missing something or need more information?
Call our aftersales team on
0333 321 3142
Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
EU Authorised Representative: Authorised Representative Service, 77 Camden Street Lower Dublin, D02 XE80, Ireland
Drill & 2-3mm
Spirit Level
Drill Bits
60
MM
SCREWS
BASE
FIXING PACK CONTAINS:
FIXING PACK CODE: CALBASEFP
5x60mm Screws
QTY: 12
CHECK AND TIGHTEN ALL THE FIXINGS APPLIED
TO THIS PRODUCT ON A REGULAR BASIS.
Position and secure the other Base to the edge of your
Caledonian. Ensure both Base's are flush to the edge.
REMINDER
Always pre-drill before
screwing.
Visit our website for spare instructions and
more information
www.forestgarden.co.uk
ISSUE: 0122
60
MM
SCREWS
Need help?
Do you have a question about the CALEDONIAN CALBASEPK2 and is the answer not in the manual?
Questions and answers