Dimensions & Installation; Dimensions & Panel Cutout; Installation Information; Installation Procedure - HORNER XLE 3 Manual

12 dc in, 12 dc out, 2 – 12-bit analog in
Table of Contents

Advertisement

Dimensions & Panel Cutout
 

Installation Information

 
 
The XLE/XLT utilizes a clip installation method to 
l
ensure a robust and watertight seal to the enclosure. 
Please follow the steps below for the proper install-
ation and operation of the unit.
 
This equipment is suitable for Class I, Division 2, 
l
Groups A, B, C and D or non-hazardous locations 
only.
 
Digital outputs shall be supplied from the same 
l
source as the operator control station.
 
Jumpers on connector JP1 shall not be removed or 
l
replaced while the circuit is live unless the area is 
known to be free of ignitable concentrations of flam-
mable gases or vapors.
 
WARNING- The USB ports are for operational main-
l
tenance only.   D o not leave permanently connected 
unless area is known to be non-hazardous.
 
 
 
 
 
DIMENSIONS & INSTALLATION
Page 8

Installation Procedure

 1.  Carefully locate an appropriate place to mount the 
XLE/XLT. Be       s ure to leave enough room at the top of 
the unit for insertion and     r emoval of the microSD™ 
card.
 2.  Carefully cut the host panel per the diagram, cre-
ating a 92mm x 92mm +/-0.1 mm opening into which 
the XLE/XLT may be installed. If the opening is too 
large, water may leak into the enclosure, potentially 
damaging the unit. If the opening is too small, the 
OCS may not fit through the hole without damage.
 3.  Remove any burrs and or sharp edges and ensure 
the panel is not warped in the cutting process.
 4.  Remove all Removable Terminals from the 
XLE/XLT. Insert the       X LE/XLT through the panel 
cutout (from the front). The gasket       m ust be between 
the host panel and the XLE/XLT.
 5.  Install and tighten the four mounting clips (provided 
in the box) until the gasket forms a tight seal (NOTE:  
Max torque 0.8 to 3 Nm,       o r 7-10 in-lbs).
 6.  Reinstall the XLE/XLT I/O Removable Terminal 
Blocks. Connect communications cables to the 
serial port, USB ports, Ethernet port,and CAN port 
as required.
 
 

Battery Maintenance

 
The XLE/XLT uses a replaceable non-rechargeable 3V Lith-
ium coincell battery (CR2450) to run the Real-Time Clock 
and to keep the retained register values. This battery is 
designed to maintain the clock and memory for 7 to 10 
years. Please reference MAN0878 providing instructions 
on how to replace the battery.