Electrolux Professional Compass Pro W5600X Installation Manual

Washer extractor

Advertisement

Quick Links

Installation manual
Washer extractor
W5600X
Compass Pro
Type EXSM.X.
438 9057-10/EN
Original instructions
2021.09.21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Compass Pro W5600X and is the answer not in the manual?

Questions and answers

Summary of Contents for Electrolux Professional Compass Pro W5600X

  • Page 1 Installation manual Washer extractor W5600X Compass Pro Type EXSM.X. 438 9057-10/EN Original instructions 2021.09.21...
  • Page 3: Table Of Contents

    Contents Contents 1 Safety Precautions ..........................5 General safety information......................6 Commercial use only........................6 Symbols............................6 2 Warranty terms and exclusions......................7 3 Technical data.............................8 Drawing ............................8 Technical data ...........................9 Connections ..........................9 4 Setup ...............................10 Unpacking ..........................10 Siting ............................10 Mechanical installation ......................11 4.3.1 Foundation ........................11 4.3.2 Casting a foundation.......................12 4.3.3 Chemical bolts .......................13 4.3.4 Fastening the machine....................14...
  • Page 5: Safety Precautions

    Installation manual 1 Safety Precautions • Servicing shall be carried out only by authorized personnel. • Only authorized spare parts, accessories and consumables shall be used. • Only use detergent intended for water-wash of textiles. Never use dry cleaning agents. •...
  • Page 6: General Safety Information

    Installation manual farm houses, by clients in hotels, motels and other residential type environments, bed and breakfast type environments, areas for communal use in blocks of flats or in launderettes. 1.1 General safety information The machine is only intended for water-wash use. Do not hose down the machine with water.
  • Page 7: Warranty Terms And Exclusions

    Warranty will be applicable where the customer has used only genuine spare parts and has performed maintenance in accordance with Electrolux Professional user and maintenance documentation made available in paper or elec- tronic format. Electrolux Professional strongly recommends using Electrolux Professional approved cleaning, rinse and descaling agents to obtain optimal results and maintain product efficiency over time.
  • Page 8: Technical Data

    Installation manual 3 Technical data 3.1 Drawing B(a) B(b) fig.8036 Operating panel Door opening, ⌀ 535 mm Detergent container Cold water Hot water Drain valve Liquid detergent supply, 6 x ⌀ 10 mm, 1 x ⌀ 16 mm and 1 x ⌀ 20 mm Electrical connection Steam connection Detergent supply injector, powder, right or left side (option)
  • Page 9: Technical Data

    Installation manual 3.2 Technical data Weight, net Drum volume litres Drum diameter Drum speed during wash Drum speed during extraction G-factor, max. Heating: Electricity Heating: Steam Heating: Hot water Frequency of the dynamic force 10.5 Floor load at max extraction 10±15.6 Sound power/pressure level at extraction* dB(A)
  • Page 10: Setup

    Installation manual 4 Setup 4.1 Unpacking Note! Two persons are recommended for the unpacking. The machine is delivered bolted onto the transport pallet and packed in a crate or box. Remove packing from the machine. Remove the bolts between the machine and pallet. There are two bolts in the front of the machine and two bolts in the back of the machine.
  • Page 11: Mechanical Installation

    Installation manual 4.3 Mechanical installation Floor The machine is designed to be bolted in position to a concrete floor or specially prepared concrete foundation. The machine must be securely fastened to a suitable foundation using M16 (5/8 inch) threaded rod, flat washers and lock nuts or lock washers.
  • Page 12: Casting A Foundation

    Installation manual 4.3.2 Casting a foundation • Break up the existing floor to a depth of approx. 75 mm and check that the sides of the hole are tapered outward so that the longest side at the bottom measures 130 mm more than at the top. fig.7663 •...
  • Page 13: Chemical Bolts

    Installation manual 4.3.3 Chemical bolts An alternative to breaking up the existing floor or foundation is to use chemical bolts M16. 1. Mark and drill four holes (⌀ 18 mm) 125 mm deep for the chemical bolts. Check the previous table for the correct position of the holes. 2.
  • Page 14: Fastening The Machine

    Installation manual 4.3.4 Fastening the machine Place wide steel shims (A) on the concrete foundation over the bolts. fig.7666 Position the machine on the foundation. Check that the machine is in level and stand firmly on all supporting points. Spacing washers must be mounted if one or more of these points is not resting against the foundation.
  • Page 15: Water Connection

    Installation manual Tighten the nuts. Check and tighten the nuts every week for the first month. 10 7 fig.5902 It is of the upmost importance that the machine is placed in level, from side to side as well as front to rear. If the machine is not properly levelled, it may result in “out-of-balance”...
  • Page 16: Connection Of External Dosing Systems

    Installation manual FOR AUSTRALIA: The appliance shall be installed in accordance with AS / NZS 3500.1 The appliance need to be installed using dual check valves. Contact details for after sales service: service.au@electroluxprofessional.com 6 Connection of external dosing systems 6.1 Connection of the hoses The machine is prepared for connection of external dosing systems or water re-use systems etc.
  • Page 17: Machine Without Connectors

    Installation manual 6.2.1 Machine without connectors Connect the external dosing system to the I/O board, which is located to the right of the incoming power supply. The I/O board has edge connectors for connecting external dosing systems. Edge connectors on the I/O board can be loosened for connecting cables. fig.6572 11 = N 18 = Program run...
  • Page 18: Outputs

    Installation manual 6.2.2 Outputs Connect the power supply (e.g. 24V DC) for the external liquid supplies to 9 and 10. If an internal power supply (from the machine) is being used, it can be taken from 1 (N) and connected to 9 and from 2 (L) and connected to 10. Max load on the outputs 0.5 A.
  • Page 19: Inputs

    Installation manual 6.2.3 Inputs The signal level can be 5-24V DC/AC or 100- 240V AC. For 5-24V, the signal reference is connected to 3 and for 100-240V to 4. Potentials on the inputs cannot be mixed. Note! The I/O board will be damaged if the voltage on connection 3 is too high > 24V. Connection 8 may be connected if the program is to pause, e.g.
  • Page 20: Drain Connection

    Installation manual 7 Drain connection Connect a 75 mm flexible hose to the drain outlet of the machine. The drain hose must not have any sharp bends and must slope from the machine to assure proper drainage. The outlet must open freely to the main drains. Note! Do not reduce the size of the drain connection from the machine to the main drain.
  • Page 21: Electrical Connection

    Installation manual 9 Electrical connection 9.1 Electrical installation The electrical installation may only be carried out by qualified personnel. Machines with frequency-controlled motors can be incompatible with certain types of earth leakage circuit break- er. It is important to know that the machines are designed to provide a high level of personal safety, which is why items of external equipment such as earth leakage circuit breakers are not necessary but is recommended.
  • Page 22: Machine Connection

    Installation manual 9.3 Machine connection 9.3.1 Three-phase connection Connect the earth, neutral and phase wires as shown. L1 L2 L3 3N AC...
  • Page 23: Functions For I/O-Cards

    Installation manual 9.4 Functions for I/O-cards The electrical schematic can be one of the following: 9.4.1 External coin meter/Central payment (2A) The signal received from external coin meters must be a pulse between 300–3000 ms (500 ms is recommended) with a minimum pause of 300 ms (500 ms is recommended) between two pulses. fig.6606A...
  • Page 24: Central Payment (2B)

    Installation manual 9.4.2 Central payment (2B) To start the machine from a central payment system, the payment system must transmit a start pulse to the machine. The start pulse can be either 230V or 24V. In order to receive a feedback signal once the machine has started, 230V or 24V must be connected to connection 19.
  • Page 25: Outputs For Detergent Signals And Inputs For Pause Signals, "Empty" Signal And Price Reduction (2D)

    Installation manual 9.4.3 Outputs for detergent signals and inputs for pause signals, "empty" signal and price reduction (2D) The figure shows standard function addressing for machines with the coin program package. By maintaining an active (high) signal on connection 5 ("Price red"), the price of the program can be reduced. This function has a number of uses, including providing reductions during a specific period of the day.
  • Page 26: Machines With I/O Module Type 3

    Installation manual 9.4.4 Machines with I/O module type 3 By maintaining an active (high) signal on connection 3 "Price reduction”, the price of the program can be reduced. This function has a number of uses, including providing reductions during a specific period of the day. Whilst the sig- nal remains active (high), the price of the program is reduced by the percentage entered in the price programming menu.
  • Page 27: Steam Connection

    Installation manual 10 Steam connection Inlet pipes connected to the machine must be equipped with a manual shut-off valve to facilitate installation and servicing. Attach the filter supplied with the machine to the manual shut-off valve. Connection hoses should be of the quality required according to regulations in the country of use. Connection size at filter:DN 20 (BSP 3/4").
  • Page 28: At First Power Up

    Installation manual 11 At first power up When the installation is complete and the power is connected for the first time you will be forced to make the following settings. When one setting is ready you will automatically enter the next one. •...
  • Page 29: Function Check

    Installation manual 12 Function check May only be carried out by qualified personnel. A function check must be made when the installation is finished and before the machine can be ready to be used. Open the manual water valves. Start a program. •...
  • Page 30: Disposal Information

    Installation manual 13 Disposal information 13.1 Disposal of appliance at end of life Before disposing of the machine, make sure to carefully check its physical condition, and in particular any parts of the structure that can give or break during scrapping. The machine’s parts must be disposed of in a differentiated way, according to their different characteristics (e.g.
  • Page 32 Electrolux Professional AB 341 80 Ljungby, Sweden www.electroluxprofessional.com...

Table of Contents

Save PDF