Northern Telecom Meridian SL-1 Reference Manual page 22

2-mbs/ remote peripheral equipment cabinet maintenance/equipment replacement
Hide thumbs Also See for Meridian SL-1:
Table of Contents

Advertisement

3-8
Equipment replacement
2-Mb/s Remote Peripheral Equipment
Chart 3-4 (continued)
QUAA3 power unit replacement
St ep Pr oced ur e
12
Ensure that the 25HZ/20HZ and the LN XFR switches on the front of
the QUAA3 unit are correctly set (usually set the same as on the
removed QUAA3 unit).
13
Set the AC BRKR or AC POWER breaker (whichever is equipped
located on the front -48 V rectifier to ON.
14
If cabinet is equipped with QBL24 battery units, set the DC BRKR
breaker on the front of the units to ON.
—co nt in ued —
Appendix 1 to 553-2741-500

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Meridian SL-1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Qca146Sl-1

Table of Contents