Cable D Designations (Transmit) Local And Remote - Northern Telecom Meridian SL-1 Installation Manual

1.5 mb/s remote peripheral equipment cabinet
Hide thumbs Also See for Meridian SL-1:
Table of Contents

Advertisement

terminal, such as a Meridian SL-1 cross-connect terminal, they are terminated at that
terminal and extended to the MDF. These leads are then cut off at the MDF.
Table 2-D
Cable D Designations (Transmit)
Local and Remote
Carrier
Network
Loop
A
X
A
X
B
X
B
X
A
Y
A
Y
B
Y
B
Y
Note: These leads are grounded in the carrier shelf when cable connectors C and D are
installed in jacks C and D. They are cut off at the MDF when cables C and D go
Card
Position
Connector
Number
9
9
9
9
9
9
9
9
5
5
4
4
8
8
9
9
9
9
10 to 25 (Note)
35 to 50 (Note)
Installation and connections 2-51
Lead
Color
D Pin
1
BL-W
26
W-BL
2
O-W
27
W-O
3
G-W
28
W-G
4
BR-W
29
W-BR
5
30
6
BL-R
31
R-BL
7
32
8
33
9
BR-R
34
R-BR
Appendix 1 to 553-2601-200
Lead
Designation
C13
C14
C15
C16
S-W
GND
W-S
GND
PFX1
PFX2
O-R
PFY1
R-O
PFY2
G-R
DCST
R-G
DSCR
DETT
DETR
C5
C6
C7
C8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qca144

Table of Contents