Pre-Installation Requirements; Water Quality Parameters; Location Conditions - Acuva ArrowMAX HOME User Manual

Whole house water treatment system
Table of Contents

Advertisement

Available languages

Available languages

4. PRE-INSTALLATION REQUIREMENTS

4.1 Water Quality Parameters

For the ArrowMAX
through the water it is treating. Incoming water should meet the following quality
levels:
• UV Transmittance (UVT) >95%/cm
A pre-installation water quality test is required to determine the water
contaminants. The type and number of stages for the pre-filtration system shall be
selected accordingly, to maintain the above conditions at all times.

4.2 Location Conditions

It is recommended to install the unit indoors and out of direct sunlight. If this is not
possible and the system is outdoors or in a sunny area, the unit must be protected
from direct sunlight, rain, and freezing temperatures.
• The installation area must be away from locations where water splashes and/
or flooding are possible.
• The approximate area that must be available to install the unit is 1m × 1m.
• Relative Humidity (RH) <95%
8
HOME to work effectively, UV radiation must be able to pass
TM

Advertisement

Table of Contents
loading

Table of Contents