Installation Steps - Acuva ArrowMAX HOME User Manual

Whole house water treatment system
Table of Contents

Advertisement

Available languages

Available languages

6. INSTALLATION GUIDE
(CONT.)

6.3 Installation Steps

1) Mounting the Reactor
Use mounting brackets to mount the UV reactor to concrete, wood, or drywall,
through the following steps:
a. As shown in Figure 4, locate the desired location of the reactor, and use 3/8"
drill bit size to drill 4 holes (2 holes for each clamp) at the desired points on the
wall to mount the clamps.
Note: The holes on the wall shall be separated 13-15".
Note: The holes shall not be too big to allow proper engagement between the anchors
and the wall.
b. Screw the anchors (white color) into the walls.
c. Screw the mounting brackets (clamps) to the anchors.
d. Mount the reactor in the installed clamps.
a.
b.
c.
d.
Figure 4: Mounting the Reactor
ArrowMAX
HOME User's Manual_EN 13