SECTION 3: MW8EBF, MW12EBF (CONNECTING THE CHILLER)
A.
Attach cradle to frame per rough-in drawing. (Screws Provided - 4)
B.
Place chiller in frame.
C.
Install 1/4" union fittings on chiller inlet and outlet.
D.
Connect water line from bottle filler solenoid valve out to chiller water in. Connect chiller
water out to bottle filler delivery fitting. Note: squeeze ends of tubes back to round shape
as needed after cutting.
Solenoid Valve
Out
Solenoid Valve
In
Not Included
Chiller Water in
Chiller Water Out
Insulated Tube
Connections to Filler
Fitting
10
Provided Ball Valve
and 3/8" O.D. copper
to building water
supply
Strainer Inside