Oasis Modular Series User Manual page 13

Electronic bottle fillers
Hide thumbs Also See for Modular Series:
Table of Contents

Advertisement

SECTION 6: Electrical Connections
A.
A 2 x 4 junction box is provided for the installation of 115V receptacle. This unit is
intended to be connected to a ground fault circuit interrupting (GFCI) device to meet UL
requirements. It is recommended that a flexible conduit be used to supply power to the
junction box and chiller if used. Check the electric current available. Type and voltage
must be the same as listed on the product data plate.
B.
As you put the bottle filler panel assembly in place on the frame assembly, feed the long
green ground wire and the terminals on the power supply cord through the bushings in
the frame assembly.
C.
Attach the long green ground wire to the frame assembly junction box ground then plug
in the bottle filler power cord.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents