12. Station bracket (optional) ...................7 hardwired Type 2 plug, 3 - Type 2 socket with shutter). For a complete list of article numbers, download datasheet at www.ctek.com. 13. Two push-clips To finish the installation ............7 14. Two ST4 screws for push-clips NOTE: Refer to the top of the charging station for model information.
Waiting for RFID tag. Flashing RFID Authentication in progress. Please wait! Yellow Flashing RFID RFID tag approved. Charging will now Green start. Flashing RFID RFID tag access denied (user not red once authorized for charging). CTEK AB User & installation instructions...
NOTE: There are many different RFID formats. Contact CTEK if your RFID tags are not original CTEK RFID tags to make sure that your RFID tags are compatible with the charging station. The supported RFID standard is ISO1443A/Mifare.
For outdoor installation, the power cable and network cable are recommended to be installed from below to prevent water from entering the technical box from the top. > 2000 mm Mini-USB Carefully remove the protection cover. CTEK AB User & installation instructions...
NOTE: For single phase supplies, 3-way jumper should be used across L1, L2 and L3. For two-phase supplies, 2-way jumper should be used across L1 and L2 terminals. For further details refer to Appendix A. CTEK AB User & installation instructions...
NOTE: For most installations no change of the configuration is needed. To configure the network interface (Ethernet) NOTE: CTEK recommend that the installation technician documents the result of the configuration tests in the dedicated protocol. If the computer runs on Microsoft Windows, Download the CCU Drivers from the webbsite.
If the installation is a Nanogrid Home setup, check the Communication Navigate to Configuration>Interface>WWAN and enter APN applicable for information should be provided by the portal operator. If CTEK's portal between the external EM and the Charger the selected 4G operator. Leave remaining fields empty.
IK10 CONFORMITY impact Charging current Up to 32 A (depends on model) Hereby, CTEK AB declares that the radio equipment type, CHARGESTORM CONNECTED 2, is in compliance with Directive 2014/53/EU. Supply Connection TN-S: L1,L2,L3,N,PE INTERFACES IT: L1,L2,PE The full text of the EU declaration of conformity is available at the following Internet address:...
CTEK makes no other warranty than as set out Abbreviations or its authorized representatives. CTEK makes herein and CTEK shall in no event be liable for any 1PH OUTLET (SECOND OUTLET) ... G no warranty other than this limited warranty and indirect or consequential damages.
Page 12
W75 BU 6 W66 BU 1.5 2016-1304 To MRCD Curve C value according to BOM parts CH2 EM111 Energy Meter CH2_N W68 BU 6 2-way jumper Wago 2016-402 2016-1307 CH2_FUSE_FB W67 BK 1.5 3-way jumper Wago 2016-403 Appendices CTEK AB...
Page 13
3-PHASE ENERGY 2016-1304 BREAKER CH2 METER CH2 EM2B CH2_L1 W27 BK 6 2016-1307 CH2_L2 W28 BK 6 CH2_L3 W29 BK 6 Curve C value according to BOM CH2_N EM340 Distr. Rail Energy Meter To MRCD parts CH2 CTEK AB Appendices...
Page 14
K2, controller U4, sensor U6, button S2 and LED indicator D2 for the channel which is added to make dual outputs. 24V from This MRCD trips below 30mA AC and 6mA DC. The threshold values are determined by the sensors. 2016-1307 U3B.J306.4 The control units U3 and U4 contain failure latches. SWITCH Appendices CTEK AB...
Page 15
MODBUS CHAIN +24V CHARGE To MRCD Terminal 5 not ADDR ADDR test buttons connected in dual CONTROLLER via R1 chargers. A2 1 EM1A OCL (dual models) EM2A 120R 120R U3B.J306 Energy Meter EM111 Energy Meter EM111 CAB11 CTEK AB Appendices...