2.2 Hardware Installation
Refer to the illustration and follow the simple steps below to quickly install your LoRaWAN Gateway.
LoRa Antenna Installation
2.2.1
Step 1: Connect LoRa antennas to the LoRa antenna extension.
Step 2: Fasten the LoRa antenna extensions to the connectors.
Wi-Fi Antenna Installation
2.2.2
(For LCG-300W Only)
Step 1: Fasten the two dual-band antennas to the antenna connectors on the front panel of the LoRaWAN
Gateway.
Step 2: You can bend the antennas to fit your actual needs.
Industrial LoRaWAN Gateway
- 24 -
LCG-300 series