Opex Omation Envelopener 210 Series Operator's Manual page 90

Hide thumbs Also See for Omation Envelopener 210 Series:
Table of Contents

Advertisement

3. Continue lifting the cover off on the left side to remove it (Figure 4-11).
Note: If you were referred to this section from "Adjusting Cutter Depth,"
to return to that section.
Click here
4. Lift the Nip arm wheels to clean under them (Figure 4-12).
Operation
Omation® Series 210™ Envelopener® Operator Manual
Figure 4-11: Lifting the Nip arm cover
Figure 4-12: Cleaning under the nip wheels
OPEX Corporation
45

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Omation Envelopener 210 Series and is the answer not in the manual?

Table of Contents