Huawei SUN2000 M5 Series User Manual page 21

Hide thumbs Also See for SUN2000 M5 Series:
Table of Contents

Advertisement

SUN2000-(12KTL-25KTL)-M5 Series
User Manual
Networking Application
The SUN2000 applies to residential rooftop grid-tied systems and small-sized
ground grid-tied PV plants. Typically, a grid-tied system consists of PV strings, grid-
tied inverters, AC switches, and power distribution units.
Figure 2-3 Networking application (single inverter)
(A) PV string
(D) Load
(G) Smart Dongle
Issue 03 (2023-02-15)
NO TE
● In a TT power grid, the N-PE voltage should be lower than 30 V.
● In an IT power grid, you need to set isolation settings to input not grounded, with a
transformer.
NO TE
For detailed operations on devices in the network, see the following guides:
SUN2000-(600W-P, 450W-P2) Smart PV Optimizer Quick Guide
SUN2000 Smart PV Optimizer User Manual
MERC-(1300W, 1100W)-P Smart PV Optimizer Quick Guide
MERC Smart PV Optimizer User Manual
NO TE
● For two PV strings connected in parallel to the same MPPT circuit, the model, quantity,
orientation, and tilt angle of PV modules in the PV strings must be the same.
● The voltage of different MPPT circuits must be the same.
● The MPPT voltage must be greater than the lower threshold of the full-load MPPT
range specified in the inverter technical data sheet. Otherwise, the inverter will be
derated, causing the system yield loss.
Copyright © Huawei Digital Power Technologies Co., Ltd.
(B) SUN2000
(E) Power meter
(H) Optimizer
2 Overview
(C) AC power
distribution unit
(F) Power grid
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents