Load Shunt Bus Rearrangement; Figure 4 Load Connection Points G101 And G102 - ABB H569-445 Product Manual

Battery distribution fuse/ circuit breaker bay (bdfb/bdcbb)
Table of Contents

Advertisement

Load Shunt Bus Rearrangement

Sometimes it may be necessary to reconfigure a BDFB in the field. Two common changes are
converting two load BDFB's from top feed configurations to bottom feed configurations and
changing from a 2-load to a 4, 6, or 8-load BDFB. Additional Load Shunt Bus Kits as shown on Figure
3 and Figure 4 may be purchased separately.
Page 11
© Copyright 2021 ABB. All rights reserved.

Figure 4 Load Connection Points G101 AND G102

LOAD RETURN BUS DETAIL
3/8" HARDWARE PROVIDED
LOAD SUNT BUS DETAIL
3/8" HARDWARE PROVIDED