DuraTrel Providence Trellis 11177 Assembly & Instruction Manual

Advertisement

Assembly Instruction Manual
Please read instructions thoroughly before beginning assembly.
Check boxes carefully for contents listed. Some parts are packaged inside of others.
Assemble on a clean, flat, non-abrasive surface to prevent scratching.
In the event of missing or damaged parts please call or email our customer service department at
115 Vision Parkway
P.O. Box 122
Sheboygan Falls, WI 53085
the contact info below.

Tools Required

-Battery or Electric Drill (#2 phillips bit)
-Tape Measure
-Hammer or Rubber Mallet (Recommended)
-Shovel or Post Hole Digger (Recommended)
-PVC, Super or Crazy Glue
QUESTIONS? COMMENTS? CONTACT US!
Providence Trellis
11177
Model#
W221122-A5080
*W201121-A2040*
*W201121-A2040*
*W201121-A2040*
*W201121-A2040*
*W201121-A2040*
*W201121-A2040*
www.dura-trel.com
sales@dura-trel.com
1-877-258-6020

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Providence Trellis 11177 and is the answer not in the manual?

Questions and answers

Summary of Contents for DuraTrel Providence Trellis 11177

  • Page 1 Providence Trellis 11177 Model# W221122-A5080 *W201121-A2040* *W201121-A2040* *W201121-A2040* *W201121-A2040* *W201121-A2040* *W201121-A2040* Assembly Instruction Manual Please read instructions thoroughly before beginning assembly. Check boxes carefully for contents listed. Some parts are packaged inside of others. Assemble on a clean, flat, non-abrasive surface to prevent scratching. In the event of missing or damaged parts please call or email our customer service department at the contact info below.
  • Page 2 75" 22" Providence Trellis - Page 2...
  • Page 3 Lay out one right post (part 2). Starting at bottom, insert one top/bottom cross rail (part 3) and nine center cross rails (part 4). Slide left post (part 1) over corresponding cross rails. Insert vertical slats (part 5) through center cross rails and into bottom cross rail.
  • Page 4 Separate top of post just enough to insert remaining top/bottom rail (part 3). Using 1¼" screws, screw together trellis. Be sure that all parts are fully inserted into posts before securing. Using PVC, super or crazy glue; glue post caps onto posts. Providence Trellis - Page 4...
  • Page 5 Ground Anchor Installation Option 1 (soft ground) Slide one ground anchor (part 12) into bottom of each post until it meets bottom cross rail. Using two 1” self- tapping screws per post, screw the post to ground anchor using the pilot holes for guides. Using ground anchor installation layout drawing, dig holes approximately 12”...
  • Page 6 Warranty Statement 20 Year Guarantee Please call manufacturer direct with questions concerning missing or defective parts at Toll Free: 877-258-6020. Dura-trel, Inc. products are warranted to be free from manufacturing defects resulting in delaminating, peeling, flaking, corroding, cracking, crazing, or extreme amounts of fading or bleaching causing the PVC to change to its natural color for a period of 20 years from the date of purchase.

Table of Contents