Important Facts - Read Before Commencing Installation - Stuart Turner MAINSBOOST iBOOST F200 Installation, Operation & Maintenance Instructions Manual

Hide thumbs Also See for MAINSBOOST iBOOST F200:
Table of Contents

Advertisement

1 IMPORTANT FACTS:
A Water storage capacity.
1.11
The iBoost has a usable water volume of approximately 200 litres; the length
of time the iBoost delivers water will be dependent on the usage and refill
rates.
1.12 Ensure the pump is primed as described in the priming section before
starting, to avoid causing damage to the pump shaft seal. See Section 6 –
Commissioning.
B Water temperature
This unit is designed to pump cold water only which should not exceed the
following values:
1.13 The maximum allowable water temperature is 23
1.14 The minimum allowable water temperature is 4
C Pipework – General
1.15 Do not drill holes or put fastenings into the iBoost tank, this will cause
leakage.
1.16 System leaks: Ensure the system to be boosted is able to hold pressure and
is leak free before installing iBoost. Failure to do so will cause abnormal
operation and damage to the unit.
1.17 Secure pipework: Ensure pipework to and from pump is independently
supported & clipped to prevent forces being transferred to inlet and outlet
branches of pump. Do not secure pipework to the iBoost, this will cause
damage and possible leakage.
1.18 Flux: Solder joints must be completed and flux residues removed prior to
iBoost installation (flux damage will void any warranty).
1.19 Pipework design: Care should be taken in the design of pipework runs to
minimize the risk of air locks e.g. use drawn bends rather than 90
1.20 DO NOT introduce solder flux to flexible hose, tank, pump or any parts
manufactured from plastic.
1.21
DO NOT allow contact with oil or cellulose based paints, paint thinners
or strippers, acid based descalents or aggressive cleaning agents.
1.22
DO NOT bend the flexible hose beyond 30
straight as possible.
1.23
DO NOT feed other header or gravity tanks with iBoost. It is
acceptable to feed toilet cisterns provided the toilet fill valve operates
correctly and is leak free.
D Plumbing Installation Regulations
1.24 The plumbing installation must comply with the current water and building
regulations.
1.25 The plumbing installation must be installed by a qualified person.
E Pressure vessel
1.26 The iBoost F200 Pressure vessel is charged at the factory see Section 7 –
Maintenance for details.
1.27 The iBoost V200 pressure vessel pre-charge must be set correctly during
installation, see section 6.12 for details.
READ BEFORE COMMENCING PUMP INSTALLATION
- 6 –
o
C (see Section 7.13).
o
C.
o
. It must be installed as
o
bends.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mainsboost iboost v2004667746713

Table of Contents