Mercia Garden Products 01RAW2010DDOW-V2 General Instructions Manual

Advertisement

Quick Links

General Instructions
01RAW2010DDOW-V2
20x10 Reverse Apex Workshop
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01RAW2010DDOW-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01RAW2010DDOW-V2

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 01RAW2010DDOW-V2 Please retain product label and instructions for future reference Pre Assembly Overall Dimensions: Length = 6064mm Width = 3184mm Remove the transportation blocks Height = 2482mm from the bottom of each panel before Base Dimensions: assembling the building. Length = 5960mm...
  • Page 3 Please retain product label and instructions for future reference Step 4 Step 2 Place the oor onto a rm Following the same method outlined and level base, ensuring the in step 3, attach the next plain side & base has suitable drainage the door panel to the assembly.
  • Page 4 Please retain product label and instructions for future reference Step 6 Step 8 Place the master and slave door into Place the roof panels on top of the door panel and x into place with the building ensuring they sit 3x T-hinges per door and 7x30mm into the cut outs on the gables screws per hinge.
  • Page 5 Please retain product label and instructions for future reference Step 10 Step 12 Cut the felt into four strips lay onto Place the cover strip 13mm above the gap in the window panel and the roof as shown in the illustration. *Cut down trims to t x into place using 3x30mm screws.
  • Page 6 Please retain product label and instructions for future reference Step 14 Step 13 Fix the casement say to the To x the lock in place. Screw the Staple to the Door Gable or Slave door. window then align the xings to the window panel.
  • Page 7 Please retain product label and instructions for future reference Step 16 Fit the cover trims and nials to the gable sides securing with 12x40mm screws as shown in the illustration. *Before xing into place measure and cut down the cover trims to size.

Table of Contents