Tru-Jump STR-12FT Assembly, Installation, Care, Maintenance And User Instructions page 18

12ft trampoline and enclosure combo with spin n light and water anchor
Table of Contents

Advertisement

Step 3 – Top Rail Assembly
Complete the trampoline frame by inserting all of the Top Rails (#4) in between Top Rail with Leg Sockets (#3)
as shown below.
DO NOT PLACE HANDS NEAR
THE OPENING WHEN
CONNECTING THE TUBES.
WEAR PROTECTIVE GLOVES
TO PROTECT FROM INJURIES
DURING ASSEMBLY.
Larger hole should
be facing outward
14

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the STR-12FT and is the answer not in the manual?

Table of Contents