Sharp AR-P350 Service Manual page 31

Options ar-hd3/ar-pk1
Hide thumbs Also See for AR-P350:
Table of Contents

Advertisement

(3) R cover/clutch
2)
1)


Note:
After developer is replaced, clear the following counters:
•Developer counter
•Developing motor RPM counter
When new developer is supplied, be sure to perform the auto DV
adjustment.
Before execution of the "automatic DV adjustment," be sure to
clear the above counter.
(4) F cover/gear/clutch
6)
5)
2)
1)
#
"
!

(5) Bottom cover/Process Thermistor
4)
3)

!


AR-P350 DISASSEMBLY AND ASSEMBLY, MAINTENANCE 7-6
D. Transfer roller unit
No.
Name
1
Transfer roller
With the left door open, the transfer roller unit can be removed.
1)
2)
3)
(1) Discharge plate
(2) Transfer roller
2)
*
When assembling, first assemble the front side and insert it into the
case. Then install the rear side. That is an easy method of assembly.
Job item
Cycle
Check
50K
Replace
100K
2)
1)
3)
1)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ar-p450

Table of Contents