Feider Machines FBT400-1 Original Instructions Manual page 9

Petrol plant shredder
Table of Contents

Advertisement

Consider the length of the material to be processed through the machine and make sure
that there is enough height above the chipper/shredder to accommodate the material.
Make sure the unit is located close to the area where the chips are going to be used to
reduce carrying.
Stay clear of the discharge area. Make sure all bystanders, children, pets, or objects that
you do not want damaged or covered in chips, are clear of the discharge area.
The major components of this chipper/shredder have been assembled at the factory.
Some minor assembly is required. The assembly process will use all the parts and
hardware listed in the inventory.
DO NOT attempt to start this machine until all assembly has been completed. Serious
personal injury and damage to the machine could occur.
To assemble the chipper/shredder:
Tip the chipper/shredder over and remove the bolts shown in Pic.2. DO NOT turn the
1.
chipper/shredder over once it is full of oil and gas. The oil and gas will spill out.
For fixing the leg: 2pcs Bolt M8x20, 1pc Bolt M8x200, 1pc Support Tube, 4pcs
Washer Ø8, 3pcs Lock nut M8.
For fixing the wheel assembly: 4pcs Bolt M8x20, 4pcs Washer Ø8, 4pcs Lock nut
M8.
Attach the wheel assembly and the leg with the bolts that were removed in Step 1.
2.
Assembly of the ejection hopper
Assembly
Pic.2 Attaching the leg
09

Advertisement

Table of Contents
loading

Table of Contents