2
Lead one end of the rotation
line under the trampoline and
up through the grommet loca-
ted adjacent to the deck-
mounted rotation cleat. Pass
the line through the cleat fair-
lead and tie off at the stay ad-
juster. Repeat procedure for
other side.
13
Mast rotation
1
Locate the rotation line. Pass one
end through the end of the rotation
arm. Both ends of the line go down
through the grommet located in
the middle of the trampoline be-
hind the trampoline pocket.