Door Reversibility; Electrical Connection; Prior To Initial Start-Up - AEG SANTO Z 9 18 44-4 i User Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation

Door reversibility

Electrical connection

A correctly installed, earthed socket is required for the electrical sup-
ply. The supply must have a fuse rating of at least 10 Amps. If the
socket is not accessible once the appliance is built in, the electrical
installation must include suitable means of isolating the appliance
from the mains (e.g. a fused spur).
Before initial start-up, refer to the appliance rating plate to ascertain
if supply voltage and current values correspond with those of the
mains at the installation location.
e.g.: AC 230 ... 240 V 50 Hz or
230 ... 240 V ~50 Hz
(i.e. 230 to 240 volts alternating current, 50 Hertz)
The rating plate is inside the appliance on the left.
Prior to Initial Start–Up
Please clean the appliance interior and all accessories prior to initial
start-up (see section: "Cleaning and Care").
Standby time
The oil for automatic lubrication contained in the compressor may
flow into the refrigeration circuit if the appliance is transported in an
inclined position. To allow the oil to flow back into the compressor,
wait approximately 1 hour before placing the appliance in operation.
180°
13

Advertisement

Chapters

Table of Contents
loading

Table of Contents